BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Greer, South Carolina. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

As of March 12, 2021, bids are still under review for this project. Bid Results are not yet available. Project work includes: Project consists of mill and overlay of asphalt shoulders of Taxiway A, B, J, K, and a portion of L, mill and overlay a portion of asphalt Taxiway L, mill and overlay asphalt Taxiways D and G, full-depth replacement of a portion Taxiway L5 (concrete and asphalt pavement) and Taxiway L6 (concrete pavement), excavation, filling/grading, and transport of material to/from the project site, underground utility installation and relocation, drainage improvements, re-vegetation and erosion control. Email teleconference link requests to Justin Gobbel -- justin.gobbel@kimley-horn.com -- RE: GSP Airfield Pavement Improvements Program -- Priority 1. Contractor may request a tour of the project site. Email site tour requests to Justin Gobbel -- justin.gobbelkimley-horn.com -- RE: GSP Airfield Pavement Improvements Program -- Priority 1. 5) Contractor Qualifications: All Bidders Shall Submit Evidence of Competency and Evidence of Financial Responsibility With Their Bid. Failure to Provide This Documentation May Be Grounds for Determining the Bid Non-responsive. 6) Federal Requirements: All Bidders Are Responsible for Compliance With Federal Requirements for Preparation and Submission of the Proposal. The Successful Bidder Shall Be Responsible for Compliance With Federal Requirements in the Contract Agreement. 7) Disadvantaged Business Enterprise (Dbe): Title 49 Cfr Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Programs, Applies to This Contract. The Owner Has Set a DBE Participation Goal of 7.7% of the Dollar Value of This Contract. 8) Licensing: Each Bid Must Be by a Contractor Properly Licensed in the State of South Carolina. The Bidders Shall Certify, by Submission of a Proposal, That Neither It Nor Its Principals Is Presently Debarred, Suspended, Proposed for Debarment, Declared Ineligible, or Voluntarily Excluded From Participating in This Transaction by Any Federal Department or Agency or the State of South Carolina. 9) Bid Guaranty and Contract Bonds: a Bid Guaranty Made Payable to the Greenville-spartanburg Airport District in the Form of Either a Certified or Cashier's Check or in the Form of a Bid Bond for No Less Than 5% of the Total Bid Is Required With Each Bid. The Successful Bidder Shall Execute a Performance Bond and a Payment Bond, Each in the Amount of 100% of the Contract Price. 10) Award: No Bidder May Withdraw an Opened Bid for a Period of 90 Days Following the Bid Opening Without Greenville-spartanburg Airport District's Consent. Award for the Project Will Be Made to the Lowest Responsible Qualified Bidder, if Awarded. The Owner Reserves the Right to Reject Any or All Bids and to Waive Any Informalities, Technicalities or Omissions Therein. See Instructions to Bidders for Further Airfield Pavement Improvements Program -- Priority 1 January 20, 2021 Greenville-spartanburg International Airport Ntb-1 Issued for Bid

Post-Bid

Transportation Terminals

$2,000,000.00

Public - County

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
129
Bidding Soon
1,634
All Active Projects
699
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.