Site work and paving for a civil project in Palm Bay, Florida. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

This project is comprised of the removal, disposal, replacement, and restoration of two separate, individual culvert crossings along the Melbourne Tillman (MT) Water Control District (WCD) Canal on Emerson Drive @ MT C-51. Construction of the project will be a turn-key and will include all aspects of work including but not limited to: removal of the existing failed two culvert pipes, furnishing and installing an 8' x 5' concrete box culvert, and all associated material, equipment, labor, maintenance of traffic, traffic detours, mobilization, erosion control, clearing and grubbing, excavation, dewatering, demolition, de-mucking, disposal of unusable materials, new fill, base rock under pipe and roadway, compaction of fill, stabilization, testing, restoration of road including pavement installation, procurement and installation of selected structures, utility conflict coordination and relocations, final clean up, sodding of disturbed areas, thermoplastic striping, as-built plans, and permit closure as applicable as per the provided construction plans and specifications provided herein. The awarded contractor shall be responsible to furnish signed and sealed headwall designs for each of the locations. The term headwall and endwall may be used interchangeably and shall be understood to refer to the end treatment for the box culverts herein. The headwalls shall be designed as outlined in the FDOT Standard Plans Instructions (SPI) Index 400-292 and submitted to the City for acceptance prior to installation. For each location, the City has provided finish elevation and overall width of the headwalls in the design plans (Attachment B). General notes, illustrations, and references to applicable FDOT Standard Plans (SP) and Standard Specification (SB) Indexes for both installation and design have also been referenced. Time is of the essence, so road closures will be limited to a maximum of 21 days at each location. A detailed schedule of the road closure shall be furnished at the Preconstruction Meeting and updated monthly throughout the project. Question End Date 2/16/2021 5:00 PM

Award

Bridges / Tunnels

$338,519.00

Public - City

Paving, Site Work

8

1

2

10

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
45
Bidding Soon
888
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2021

April 22, 2021

img_map_placeholder

Emerson Dr, Palm Bay, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.