BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2021 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Red Hook, New York. Completed plans call for site work for a water / sewer project.

**As of March 24, 2021, the project has not yet been awarded. A timeline for award is not yet determined at this time. The work of Contract 1E - Electrical includes, but is not limited to, electrical power, control and lighting work at the new wastewater treatment plant site; electrical power work at approximately 131 building locations to provide power from interior power panels to effluent pump control panels provided and located by Contract 1G; concealed and exposed wiring, interior and exterior to existing buildings; installation of circuit breakers in existing panels or providing new subpanels and associated feeder breakers inter- connected to existing panels; and restoration of building spaces disturbed by the electrical work. Bids should not include sales and compensating use taxes on materials incorporated into the work. Bids actually received by mail or by hand after the appointed time on the date specified shall be rejected, notwithstanding that such Bid may have been placed in a mail box or other mail receptacle regularly maintained by the United States Postal Service before such time, and ordinarily in sufficient time to have been delivered on time. Bid security in the amount of 5% of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidder will be required to furnish a performance bond and a payment bond, each in an amount equal to 100% of the contract price. Bidders on this work will be required to comply with the President's Executive Orders No. 11246 and No. 11375, which pertain to nondiscrimination in employment. The requirements for Bidders and Contractors under these orders are explained in the Bidding and Contract Documents. The successful Bidder will be required to comply with the NYSEFC MWBE utilization goals of 23% and all other NYSEFC requirements for this project that is receiving funding from the Clean Water State Revolving Fund (CWSRF). The Village of Red Hook reserves the right to waive any informalities or irregularities in the Bids received, or to reject any or all Bids without explanation. The successful Bidder will be required to comply with the NYSEFC MWBE utilization goals of 23% and all other NYSEFC requirements for this project that is receiving funding from the Clean Water State Revolving Fund (CWSRF). Additional copies of the Bidding Documents may be purchased at the following non-refundable prices: Additional complete set, per set $100 Individual Drawings, per pages $5.00 ($5.00 min.) Individual Pages of Manual, per page $0.14 ($5.00 min.)

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

59

2

10

3

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
315
Bidding Soon
3,911
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2021

March 29, 2021

Project location map

Multiple Locations, Red Hook, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.