BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2021 at 8:00 PM

Updated August 19, 2025

Renovation of a water / sewer project in Port Dover, Ontario. Completed plans call for the renovation of a water / sewer project.

Removal and replacement of the existing clarifier at the Port Dover Water Treatment Plant (WTP) with a new dissolved air flotation (DAF) treatment system. This includes installation of the new DAF system, process and mechanical upgrades, electrical and instrumentation upgrades, building rehabilitation, and site civil upgrades. In addition, a mobile membrane treatment system shall be employed to allow the WTP to remain in operation during the construction period. The DAF system and the membrane trailer rental have been pre-purchased under separate contracts. Documents and addenda can be obtained at: https://norfolk.bidsandtenders.ca

Award

Water / Sewer

$1,524,938.00

Public - County

Renovation

257

1

35

18

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
260
Bidding Soon
4,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2021

March 8, 2021

Project location map

Nelson St W, Port Dover, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.