BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Albuquerque, New Mexico. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

https://www.abqjournal.com/2542008/journal-recommends-yes-vote-on-slate-of-state-local-bonds.html Editorial: Journal recommends 'yes' vote on slate of state, local bonds Here are the Journal's recommendations on the state and local bond questions that appear on the back of general election ballots. If approved by simple majority votes, the bonds would not result in higher property tax rates because they would replace expired or expiring GO bonds. Property taxes would theoretically go down if they were defeated. For election information, including candidate Q&As, district maps and news stories, go to the Journal Election Guide at abqjournal.com. State Bond Question 1-- For This question would authorize the state to issue $24,470,000 of general obligation bonds to make construction and equipment improvements at senior citizen facilities in 21 counties in the state. The Gallup Senior Center in McKinley County would be the single largest recipient, receiving $5,414,300 for construction costs and $76,000 for vehicles. Other big-ticket projects include the North Valley Senior Center in Bernalillo County, $2,971,442 for renovations; Santa Cruz Senior Center in Santa Fe County, $2,041,441 for construction; Amalia Senior Center in Taos County, $1,450,000 for construction; Alejandro Ruiz Senior Center in Eddy County, $1,352,442 for renovations and $162,024 for vehicles; and Palo Duro Senior Center in Bernalillo County, $1 million. All of the other projects are less than $1 million for either construction, renovation, equipment, vehicles, planning or code compliance. Unfortunately, 26 of the 72 total line-item bonds are for vehicles, which will likely be out of commission before the bonds used to buy them for senior centers have been paid off. Still, our seniors deserve quality, up-to-date facilities to gather, socialize, exercise and receive low-cost meals, and we therefore recommend approval of the bond. The State Board of Finance estimates the bond would cost the owner of a property with an asset value of $100,000 about $1.05 annually over 10 years. State Bond Question 2 -- For This question would authorize the state to issue $19,266,000 of general obligation bonds for library resources and equipment. The bond would allocate $7 million to the Cultural Affairs Department for library equipment, furniture, fixtures and supplemental library resource acquisitions, information technology projects and to purchase and install broadband internet at tribal and non-tribal public libraries statewide; $6 million for Higher Education Department academic library resources statewide; and $6 million for Public Education Department public school library resource acquisitions statewide. Libraries remain important resources and sources of information, even in the 21st century as they adapt to delivering resources online, and we therefore recommend approval of the bond that is projected to cost the owner of a $100,000 property 82 cents a year over 10 years. State Bond Question 3 -- For This question would authorize the issuance of $215,986,000 of general obligation bonds for capital projects at 28 higher education institutions, special schools and tribal schools in 20 counties. The three largest recipients would be $45 million to the University of New Mexico to construct new College of Fine Arts buildings (some lacking Wi-Fi), $36 million to UNM Health Sciences Center to expand its child psychology center and enable it to offer more beds for acute in-patient care, and $22.5 million to New Mexico State University for engineering facilities. Other large projects among the 31 line items include $15 million to Central New Mexico Community College to construct a trades and applied technology facility, $13.5 million to NMSU for a health and social sciences building, and $10.5 million to the New Mexico Department of Agriculture to replace its outdated headquarters at NMSU built in 1973. Other capital projects of at least $900,000 would be spread among higher ed institutions across the state. University leaders say new facilities are needed to educate a workforce with needed skills. Many facilities are badly in need of renovations to offer modern, safe facilities, and GO bonds are the only opportunity for many institutions to receive sufficient funding to make upgrades. Bond 3 is also estimated to create 2,000 jobs on construction, architecture and related fields. The $215 million price tag may seem high, but the money will help New Mexico institutions offer competitive college programs, certificates and degrees and result in construction jobs, economic activity and long-term investments in our state's infrastructure and public facilities. We therefore recommend approval of the bond, which is estimated to cost the owner of a $100,000 property about $9.26 annually over 10 years. All three bonds, totaling $258,759,165, are estimated to cost the owner of a $100,000 property an annual average of $11.13. Bernalillo County General Obligation Bonds -- For In the 23 years Clay Campbell has been employed with Bernalillo County, voters have never rejected a general obligation bond package to help fund capital improvements. Campbell, now the chief of staff for the Bernalillo County executive and who oversees the planning portion of the county's capital improvement plan, says strong messaging in two areas seems to resonate with voters: The bond money is part of a "scaffolding" strategy to attract state capital outlay funds and federal grants for big-ticket projects, and bond approval doesn't increase taxes. Bernalillo County has more than $584 million of unfunded projects in its Capital Improvement Plan. The 2022 bond package is $40.5 million and will be leveraged with state, local and federal funding sources to address needs in six areas: Libraries, $1.5 million Public safety, fleet and facilities, $12.9 million Parks and recreation, $11 million Transportation, $10.2 million Storm drainage and utilities, $4.4 million Housing, $425,000 Each of the six areas is addressed in a separate general obligation bond question on the fall ballot. Most of the bond proceeds are for maintenance or improvements, but $5 million would go toward a new fire station on Edith Boulevard NE; $2 million for a BCSO substation at Eubank and Holly NE; and $4 million for design and construction of a new outdoor pool at the Raymond G. Sanchez Community Center in the North Valley. We've seen the project list and, in our opinion, it represents reasonable investments -- with a familiar exception. Using long-term debt retirement as a means to replace sheriff's vehicles and the county's heavy equipment seems fiscally imprudent. But it's allowable by law and we won't condemn the entire package over a single sticking point. See the breakdown of projects and costs at bernco.gov/capital-improvement-program/general-obligation-bonds/. The projects not only improve quality of life in Bernalillo County, but create construction jobs and contribute to economic activity. While Bernalillo County could bond for a higher dollar value, it doesn't so that debt service remains manageable. Voter approval of the bonds would not result in higher property tax rates because the debt service for the new bonds would replace prior bonds. For every $100,000 of assessed value, $42.13 of a property owner's tax bill would go toward debt service. We urge voters to vote for the six questions that make up this year's Bernalillo County bond package. Albuquerque Metropolitan Arroyo Flood Control Authority -- Yes At the bottom of this year's ballot is the bond question for the Albuquerque Metropolitan Arroyo Flood Control Authority (AMAFCA). Anyone who's lived in Albuquerque for more than one monsoon season understands the importance of flood control. AMAFCA is the quiet player behind the scenes identifying priorities and building out the infrastructure to channel runoff water safely through the Metro area. AMAFCA builds and maintains dams, spillways, pump stations, surge ponds, levees and drainage systems. Voters are being asked to approve $25 million in flood-control bonds to help fund projects throughout the Albuquerque area for the next two years. There is no tax increase as a result of approving these bonds. Over the last six years, the AMAFCA capital program has contributed $118 million to the local economy, or an average of $19 million dollars a year, funding studies, design and construction of flood control and water quality facilities in the urban area supporting over 800 local jobs. Currently AMAFCA has $48 million of outstanding debt and has a statutory limit of $80 million. AMAFCA has held its debt service mill levy to 0.675, unchanged since 1999. A home with a market value of $300,000 pays about $68 a year toward AMAFCA's debt service. We urge voters to vote "yes" to AMAFCA's "Flood Control" bond question. _____________________________ The new AT building will provide approximately 60,000 GSF, including faculty offices, conference rooms, a library and resource center, classrooms, computer labs, a proto-typing fabrication lab, and specialty shops. Lab support spaces, tool cribs, and outdoor yard space will be adjoining the specialty shops. In addition, community outreach and industry showcase spaces will be provided to expose and celebrate the ever changing, technology inclined trades careers. The preliminary project schedule calls for: Schematic Design completion in March 2022 Design Development completion in June 2022 Construction Documents completion in December 2022 Construction to begin January 2023 and be completed January 2025 The CMAR shall actively participate as a member of the Project Team with CNM and the Design Professional beginning with design concept and constructability reviews and construction cost estimating at the completion of Programming and will continue through the Design, Construction, Commissioning, Closeout and Warranty phases of the Project. The purpose of these Preconstruction, Construction, Commissioning, Closeout and Warranty responsibilities is to provide the expertise necessary to ensure that the Program objectives are realized, the Project budget and Schedule are met, the facility is fully operational when occupied, and defects detected during the Warranty Period are addressed.

Post-Bid

Educational

$26,495,150.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

152 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
16
Bidding Soon
321
All Active Projects
133
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 31, 2022

January 2, 2023

img_map_placeholder

To Be Determined, Albuquerque, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.