BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a transportation facility in Dallas, Texas. Completed plans call for site work for a transportation facility.

**As of May 13, 2021, project has been awarded in the amount of $3,513,597.89. Minority-women Business Enterprise (MWBE) Goal: 40% CONTACT: Contract Administrator, Scioscia Flowers 972-973-1744, sflowers1@dfwairport.com The Work of this Contract comprises of rehabilitation of the existing roadway pavement systems. Construction will be outside the Airport’s Air Operations Area (AOA). The Contractor shall be responsible for reviewing all existing conditions associated with the Work prior to commencement of work activities. A. Phase 3A, Location 1, from Terminal E access ramp bridge-end for approximately 450 feet towards the terminal. B. Phase 3A, Location 2, three sanitary sewer manholes to be adjusted to match surrounding pavement. C. Phase 4B, Location 3, Phase 1, southbound bus slip ramp, existing southbound International Parkway asphalt shoulder from the south end of the Cross under No. 7 bridge through the bus exit ramp north of the southbound control plaza. Construction will be outside the Airport’s Operations Area (AOA). While this ramp is closed for construction, the buses will need to detour via the service roads or through the main control plaza. The Contractor shall be responsible for reviewing all existing conditions associated with the Work prior to commencement of work activities. This phase cannot be performed at the same time as Phase 4B, Location 2, northbound bus slip ramp. D. Phase 4B, Location 3, Phase 2, southbound service road, from the southbound bus exit ramp (Location 4), extending approximately 850 feet south adjacent to the control plaza. E. Phase 4B, Location 4, northbound bus slip ramp, full width northbound bus entrance ramp to International Parkway main lanes immediately north of the northbound control plaza. This phase cannot be performed at the same time as Phase 4B, Location 4, southbound bus slip ramp. F. Phase 4B, Location 5, southbound service road, existing asphalt shoulder from the juncture with southbound ramp from Airfield Drive to the existing wide concrete pavement header, approximately 473 feet.

Award

Transportation Terminals

$3,513,598.00

Public - City

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
175
Bidding Soon
3,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.