Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a water / sewer project in San Antonio, Texas. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
construction and improvements of the electrical, power systems, and instrumentation and controls (I&C) system for the Steven M. Clouse Water Recycling Center (SMC WRC). The work consists of improvements to the plant's 15 kV electrical distribution system to support other equipment to be installed; electrical and I&C improvements to, headworks, primary clarifiers, solids thickening; construction of a new building to house all equipment associated with the new supervisory control and data acquisition (SCADA) and information technology systems; construction of prefabricated buildings and associated foundations to house motor control centers; new Rockwell PlantPAx System; installation of duct banks for new plant wide fiber optic communication network; field instrumentation required to connect to the new Rockwell PlantPAx system; installation of workstations throughout the SMC WRC and additional workstations at the Leon Creek Water Recycling Center and Medio Creek Water Recycling Center For questions regarding this solicitation, technical questions or additional information, please contact Roxanne Lockhart, Contract Administrator, in writing via email to: roxanne.lockhart@saws.org or by fax to 210-233-4438 until 4:00 PM (CDT). Answers to the questions will be posted to the web site by 10:00 AM (CT) on August 25, 2021 as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or City of San Antonio officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract(s) awarded under this Request for Competitive Sealed Proposals (RFCSP) is/are expected to be funded in part by a loan or loan with principal forgiveness from the TWDB and a grant from the United States Environmental Protection Agency, U.S. EPA. Neither the State of Texas, the U.S. EPA, nor any of its departments, agencies, or employees, are or will be a party to this Request for Competitive Sealed Proposals or any resulting contract. Payment Bond - In accordance with Chapter 2253 of the Texas Government Code as amended, the security furnished by the Contractor through the Surety in the full amount of the Contract Sum for the protection of all persons supplying labor and material in the prosecution of the Work who properly follow statutory requirements for perfecting claims against such security. If the Contract amount does not exceed $25,000, a Payment Bond may not be required. Performance Bond - In accordance with Chapter 2253 of the Texas Government Code as amended, the security furnished by the Contractor through the Surety in the full amount of the Contract Sum as a guaranty that the Work will be faithfully performed and completed and that the Owner will be saved harmless from all costs and damages which the Owner may suffer by reason of the Contractor's default or failure to perform the Work. If the Contract amount does not exceed $25,000, a Performance Bond may not be required. All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Clean Water Sate Revolving Funds (CWSRF) shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code. Wages to be paid on this project will be governed by the Department of Labor Wage General Decision or Decisions included in the proposal documents for this project. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability or genetic information. Respondents on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors -- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. The San Antonio Water System has the right to reject any and all proposals. Comply with all record keeping and reporting requirements under the Clean Water Act/Safe Drinking Water Act, including any reports required by a Federal agency or the Finance Authority such as performance indicators of program deliverables, information on costs and project progress. The Participant understands that (i) each contract and subcontract related to the Project is subject to audit by appropriate federal and state entities and (ii) failure to comply with the Clean Water Act/Safe Drinking Water Act and this Agreement may be a default hereunder that results in a repayment of the Loan in advance of the maturity of the Bonds and/or other remedial actions. The Davis-Bacon prevailing wage requirements apply to Contractors and Subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration or repair (including painting) of a treatment works project under the CWSRF or a construction project under the DWSRF. For prime contracts in excess of $100,000, Contractors and Subcontractors must also, under the provisions of the Contract Work Hours and Safety Standards Act, as amended, pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked over 40 in a workweek. The Fair Labor Standards Act may also apply to Davis-Bacon covered contracts. Any contracts or subcontracts in excess of $2,000 must include the provisions of the Davis-Bacon Wage Rate Requirements found in TWDB Guidance No. DB-0156. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price Any contract(s) awarded under this Request for Competitive Sealed Proposals is/are subject to the American Iron and Steel (AIS) requirements of Section 608 of the Federal Water Pollution Control Act. The SMWVB goal on this project is 20%
Award
Water / Sewer
$24,343,720.00
Public - City
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2021
November 19, 2021
3495 Valley Rd, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Apr 03 2019
San Antonio, TX
Bid Date: Dec 20 2018
San Antonio, TX
Bid Date: Apr 04 2019
San Antonio, TX
Bid Date: Feb 26 2019
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Dec 15 2021
San Antonio, TX
Bid Date: Sep 10 2020
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Sep 15 2020
San Antonio, TX
Bid Date: May 08 2020
San Antonio, TX
Bid Date: Feb 06 2019
San Antonio, TX
--
San Antonio, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.