Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 16, 2021 at 8:00 PM
Updated June 5, 2025
Site work and renovation of a civil project in Canton, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**Completion time 104 calendar days, weather days and holidays excluded. The purpose of this project is to perform repairs to Cedar Creek Watershed, Structure Site No. 136, a single-purpose flood retarding structure (FRS) designed in 1964 and built in 1965.The structure is an integral part of the Cedar Creek Watershed, a sub-watershed of the Trinity River Watershed. Site No. 136 is located on an unnamed tributary of Lacy Fork, a tributary of Cedar Creek This site is located approximately 12 miles southwest of Canton, Van Zandt County, Texas. Components to be repaired as part of this project are the upstream embankment slope and fences. The upstream slope repair consists of stripping and stockpiling the topsoil from the upstream embankment slope, excavating the upstream slope, rebuilding the slope with compacted earthfill, placing rock riprap armoring on the slope and placing topsoil on exposed earthfill areas above the normal water level. New barbed wire fences will be constructed around the embankment and spillways. Performance time for completion of this contract is 104 calendar days, holidays and weather days not included. Estimated magnitude of work is between $250,000 and $500,000. Clearing The work shall consist of the clearing and disposal of trees, snags, logs, brush, shrubs, stumps, and rubbish from the designated areas removal, salvage, and disposal of structures (including fences) installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
Award
Water / Sewer
$429,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2021
April 8, 2021
To Be Determined, Canton, TX
Related To This Project
Canton, TX
Bid Date: Aug 19 2025
Canton, TX
Bid Date: Aug 05 2025
Canton, TX
Bid Date: Aug 19 2025
Canton, TX
Bid Date: Nov 06 2025
Canton, TX
Bid Date: Feb 04 2026
Canton, TX
Bid Date: Feb 10 2026
Canton, TX
Bid Date: Jan 29 2026
Canton, TX
Bid Date: May 29 2025
Canton, TX
--
Canton, TX
Bid Date: Mar 11 2021
Canton, TX
Bid Date: Nov 24 2020
Canton, TX
--
Canton, TX
Bid Date: Mar 21 2025
Canton, TX
Bid Date: Mar 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
