BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

As of Dec 2 the project was awarded to Rock Church Construction Inc for $1,963,843 , some part of the project was awarded to Johnson Controls Inc.$17,700. This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of selective demolition of doors and frames, masonry shafts, interior partitions, stage, fixed seating, finishes, mechanical, and electrical; remodeling approximately 2,997 gross square feet on the First Floor, and 1,746 gross square feet on the Balcony of Agricultural Hall located at 1450 Linden Drive. The project includes ADA and instructional technology improvements. The work scope includes new room finishes for the floors, walls, and ceilings; new ductwork and fan coil unit; replacement of lighting with energy efficient fixtures; IT and Audio-Visual upgrades. Work scope also includes extension of the existing sprinkler system in Agricultural Hall to cover the work area. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically on the WisBuild DFD Information System.

Under Construction

Educational

$1,981,543.00

Public - State/Provincial

Renovation

60

26

11

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
58
Bidding Soon
939
All Active Projects
426
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 14, 2022

img_map_placeholder

1450 Linden Dr, Madison, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.