BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Lore City, Ohio. Completed plans call for the renovation of a playground / park / athletic field.

The Ohio Department of Natural Resources (ODNR), through the Division of Parks and Watercraft is responsible for the management of the State Park Lodges and Conference Centers. These facilities provide a place for recreational activities, primarily dining and lodging, with access to outdoor amenities for the park users and the public in general. This Request for Qualifications (RFQ) is being issued to obtain Professional Design (A/E) services for the design and management of a series of improvement projects at the Mohican and Salt Fork State Park Lodges. Submit all questions regarding this RFQ in writing to Jill Hoobler at Procurement@ofcc.ohio.gov with the project number included in the subject line (no phone calls please). Questions will be answered and posted to online on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. This series of projects will utilize the Construction Manager-at-Risk (CMR) delivery model. A Guaranteed Maximum Price (GMP) is anticipated to be negotiated for this series of projects according to the General Conditions (CM at Risk Project). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority (OFCC) and/or Owner's (ODNR) policies and procedures. The Ohio Department of Natural Resources (ODNR), through the Division of Parks and Watercraft is responsible for the management of the State Park Lodges and Conference Centers. These facilities provide a place for recreational activities, primarily dining and lodging, with access to outdoor amenities for the park users and the public in general. This Request for Qualifications (RFQ) is being issued to obtain Professional Design (A/E) services for the design and management of a series of improvement projects at the Mohican and Salt Fork State Park Lodges. Facility Master Plans were completed in 2015 for several of ODNR's State Park Lodges under their "Warm, Safe, Dry" initiative. These assessments focused on life safety improvements needed to bring the facilities up to current building codes and standards, while at the same time, enhancing the use and comfort of the lodge guests. Roof and building envelope conditions as well as related infrastructure were also reviewed in these assessments. Implementation budgets and suggested project phasing was included as part of the assessment report. After the first phase of renovation was completed in fiscal years 15/16, the Master Plans were again updated in June 2017 to determine and prioritize the next phases of renovation work This series of projects will be focused on Infrastructure improvements and other code compliance priorities. The Lodges will remain open and operational during all phases of design and construction. Consideration will need to be given with regards to phasing and staging of construction activities to accommodate minimal disruption of lodge operations. The State Park Lodges included in this series of work scopes are: 1. Mohican Lodge & Conference Center, Perrysville, Ohio / Ashland County 2. Salt Fork Lodge & Conference Center, Cambridge, Ohio / Guernsey County The Mohican Lodge & Conference Center was built in 1972 and is located on Pleasant Hill Lake below the scenic Mohican-Clearfork River. The scope of work at Mohican includes Electrical upgrades (lighting, power systems, telecommunications, information technology, CCTV, access control) and windows and frames. Emergency generator, HVAC & MEP system upgrades, elevator repairs, electrical upgrades, interior renovations, building envelope & site work. The Salt Fork State Park Lodge & Conference Center was opened for business in 1972 and is tucked away in Ohio's largest state park, alongside Salt Fork Lake and surrounded by lush woods and natural beauty. The scope of work at Salt Fork includes guest room balconies, ADA compliant elevator at pool, electrical upgrades (lighting, power systems, telecommunications, CCTV, access control) and windows and frames. Emergency generator and HVAC system upgrades. HVAC upgrades, elevator repairs, electrical upgrades, interior renovations, site work. The development of a complete Program of Requirements (POR) will also be included as part of the Professional Design Services. This POR development will include review and validation of the ODNR Lodge Facility Master Plan / Assessment Report, to define/refine the anticipated programmatic scope. The POR effort should also accomplish a project scope that is prioritized to align with the project budget. Evaluation of the project construction schedule will also be a part of the POR stage.

Post-Bid

Playgrounds / Parks / Athletic Fields

$24,415,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
107
Bidding Soon
1,673
All Active Projects
739
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 9, 2021

July 8, 2022

January 31, 2024

img_map_placeholder

Multiple Locations, Lore City, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.