Renovation of a mixed-use development in Tucson, Arizona. Completed plans call for the renovation of a laboratory facility.

SITE VISIT is MANDATORY and a reservation is required by February 8, 2021 3:00 PM. Site Visits will be conducted on February 9, 2021 and February 10, 2021 at various times during the timeframe of 9:00 am 2:00 pm. Multiple time slots are available to accommodate safe distancing measures required due to COVID-19. Two (2) members of a firm will be allowed to visit the site. Firm must make a reservation for one (1) thirty-minute slot by February 8, 2021 3:00 PM. Reservations may be requested by emailing the assigned Project Manager, Mike Baker at mbaker@pima.edu. Time Slots for Mandatory Site Visit 9:00 - 9:30 10:00 - 10-30 11-11:30 12:30 -1:00 1:30 - 2:00 QUESTIONS and Requests for Approval of Equal Items of Equipment and/or Materials pertaining to this bid must be communicated in writing and be received via email by February 12, 2021 3:00 PM. (Tucson Time). Questions must be sent to the email address below and include the specified Bid Number, Project Name and Procurement Analyst's name in the subject field of the email. Any questions should include a reference to the appropriate page and section number of the bid. E-Mail questions to: do-bidsproposals@pima.edu. ANSWERS to Questions submitted in writing and during the Pre-Bid Conference will be posted to Pima Community College Website by 5:00 P.M. (Tucson Time) on February 17, 2021. Senior - Procurement Analyst, Jennifer Moore, CPPB, MBA do-bids-proposals@pima.edu.

Award

Laboratories

$5,500,000.00

Public - County

Renovation

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Partitions, Storage Specialties, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Specialty Casework, Laboratory Casework, Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, HVAC Fans, HVAC Power Ventilators, Air Terminal Units, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Material Storage, Storage Equipment and Systems, Storage Cabinets

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
9
Bidding Soon
205
All Active Projects
87
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2021

April 21, 2021

img_map_placeholder

2202 W Anklam Rd, Tucson, AZ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pima Community College PCC West Lab Building F Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.