BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2021 at 7:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Baldwin City, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Douglas County Project 2018-31 consists of Removal of Existing Structure (32-6 Steel Beam w/ Concrete Abutments), Grading, Bridge Construction (24-32-24 RCSH Span Bridge w/ 28 Roadway), Piling, Pre-Drilled Pile Holes, Slope Protection, Aggregate Base (AB-3), Light Type Surfacing (SS-3), Guardrail, Water Well Plugging, Seeding, and Traffic Control. Douglas County Project 2018-31 is located on E300 Road approximately 14 miles west of Baldwin City, KS.

Award

Bridges / Tunnels

$468,549.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
88
Bidding Soon
1,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2021

May 3, 2021

Project location map

E300 Road, Baldwin City, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.