Published August 18, 2021 at 8:00 PM

Updated March 16, 2024

Demolition, site work, renovation and addition to a mixed-use development in Washington, New Jersey. Completed plans call for the renovation of a educational facility; for the demolition of a educational facility; educational facility; and for site work for a educational facility.

Bids must include all applicable allowances, unit prices, and numbered alternate bids. Bids will be received for the following contracts, in accordance with N.J.S.A. 18A:18A-18: SINGLE CONTRACT BID: CONTRACT NO.1 Includes all work and materials required to complete the Work outlined in the contract documents. Bid documents will not be mailed to prospective bidders under any circumstances. Each bid must be accompanied by a bid security deposit of an amount equal to at least ten (10%) percent of the amount of the base bid, but not in excess of $20,000, the deposit may be either a certified check or cashier's check drawn on an incorporated bank or trust company payable to the order of the Owner, or a bid bond in favor of the Owner as a guarantee that, in case the contract is awarded to the bidder, he will execute such contract. Upon failure to do so, the bid security will become liable up to its full amount for any difference between the amount of his bid and the Contract which the Owner may be obliged to award another bidder or bidders. The bid security deposits of all excepting the three lowest bidders will, if requested, be returned after ten (10) days from the opening of bids, Sundays and holidays excepted, and the remaining deposits will be returned when the contract of the successful bidder is approved. The successful bidder will be required to furnish a New Jersey Statutory Performance Bond and a Labor and Material Payment Bond in the amount of the contract sum. The Owner reserves the right to waive any informalities in, or to reject, any or all bids. Attention of the bidders is called particularly to the requirements of conditions of employment and to the minimum prevailing wage rates to be paid under the contract as stated in the Instructions to Bidders, the General Conditions of the Contract for Construction, and the Supplementary General Conditions. No bidder may withdraw his bid for a period of sixty (60) days after the actual date of the opening thereof. ANY and ALL Questions are to be directed to the Architect only. Questionsmust be in writing and can be faxed to 732-560-7910, Attn: Frank Bowlby or emailed to frankb@drgaia.com. All addenda will be issued compliance with New Jersey Local Public Contracts Law and New Jersey Public Contracts Law. Any requests for clarification or interpretation must be in writing and in the office of the Architect no later than noon (12:00 p.m. prevailing time) on Thursday, February 25, 2021 without exceptions.

Award

Educational

$962,000.00

Public - County

Addition, Demolition, Renovation, Site Work

40

20

9

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Temporary Roads, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Roof Tiles, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Plaques, Panel Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Play Structures
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
404
Active Projects
232
Bidding Soon
4,499
All Active Projects
2,001
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2021

May 26, 2021

img_map_placeholder

89 Bowerstown Rd, Washington, NJ


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Alterations at the Excel Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.