Demolition, site work, paving and new construction of a bridge / tunnel in Waynesville, North Carolina. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Department desires to obtain a Construction Manager / General Contractor (CM/GC) as part of the delivery of a multi-disciplined project which includes the replacement of five bridges and highway construction along I-40 in Haywood County. The Department will provide the project design and inspection team to work with the Contractor during the Pre-construction and construction phases. Design and inspection services are not included in this advertisement. The Construction Manager / General Contractor (CM/GC) project delivery method allows the use of a construction manager during the design process to provide input on the design. During the design phase, the construction manager provides advice, including constructability review, scheduling, pricing, risk analysis, and phasing, to assist in designing a more efficient and well-designed project. The construction manager may subsequently act as the general contractor and construct the project if the department and the construction manager-general contractor reach agreement on a price for construction. The contract will consist of 3 phases, Phase 1 will contain Bridge No. 57 with an anticipated contract duration of 1 year; Phase 2 will contain Bridge Nos. 159 and 171 with an anticipated contract duration of 2 year; Phase 3 will contain Bridge Nos. 124 and 142 with an anticipated contract duration of 2 year; which results in a total anticipated completed contract time of 5 years. Question and Answer Session March 25, 2021 The Department reserves the right to reject all LOIs and not proceed with procurement. NCDOT - RFP Construction Manager - Haywood County Bridge Replacements I-40. NCDOT proposes to use the Construction Manager/General Contractor (CM/GC) selection process, and then enter into a CM/GC contract with the selected construction contractor. The project includes but is not limited to pre construction and, if a negotiated price is agreed to, construction services, environmental and quality management, safety, contract administration and all necessary support services. The Haywood County Bridge Replacements Project (the project or this project) is located along I 40 in Haywood County, between exit 7 and exit 15, and will include the replacement of the following bridges: Bridge 57 at Exit 7 Structure Number 430057 Bridge 124 over SR 1388 Structure Number 430124 Bridge 142 over Pigeon River Structure Number 430142 Bridge 159 over SR 1388 Structure Number 430159 Bridge 171 over SR 1388 and Jonathon Creek Structure Number 430171

Final Planning

Bridges / Tunnels

$800,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
37
Bidding Soon
675
All Active Projects
297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2021

June 21, 2021

img_map_placeholder

I-40, Waynesville, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.