Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 10, 2021 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Boston, Massachusetts. Completed plans call for site work for a water / sewer project.
Q And A Open: 03/02/2021 19:35:10 Q And A Close: 25/02/2021 03:30:00 Northern Intermediate High Section 89 Replacement Pipeline. The funding source for work to be performed under this contract is the Massachusetts Clean Water Trust. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.20% D/MBE participation and 4.50% D/WBE participation by certified DBEs 1. Removal of approximately 10,200 linear feet of 48-inch PCCP water main and installation of steel and ductile iron water main and appurtenances in Stoneham, Winchester and Woburn, as indicated by open cut methods. The work also includes trenchless water main installations at the crossings of the Interstate 93 - Fallon Road overpass (Stoneham), Interstate 93 - Exit 35 off ramp (Stoneham), and the Aberjona River (Woburn). 2. Furnishing and installing valves, precast and cast in place valve vaults, air valves, blow- off assemblies, interconnections, manholes and all appurtenant work along the 10,200 linear feet as in item A.1 above. 3. Removal and replacement of valves, precast valve vaults, air valves, blow- off assemblies, manholes, frames and covers along 8,200 linear feet of 36-inch ductile iron water main in Woburn. The associated appurtenance replacement also includes approximately 160 linear feet of 36-inch ductile iron pipe replacement in this section. 4. Furnishing and installing tapping sleeves, linestops and at-grade temporary bypass piping to facilitate isolation at the Bear Hill Tank connection. 5. Furnishing and installing a buried temporary water bypass piping system to maintain service to Meter 234 in Winchester. 6. Abandonment of approximately 5,600 linear feet of 24-inch cast iron water main, Section 29, in Stoneham, and portions of the existing 48-inch PCCP Section 89 as indicated. 7. Transfer of service and meter connections from Section 29 to Section 110 in Stoneham. 8. Replacement of Meter 200, interior piping and fittings within the existing meter vault on Washington Street.
Award
Water / Sewer
$32,619,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2021
May 31, 2021

To Be Determined, Boston, MA
Related To This Project
Boston, MA
--
Boston, MA
--
Boston, MA
Bid Date: Sep 15 2022
Boston, MA
--
Boston, MA
Bid Date: Sep 07 2022
Boston, MA
Bid Date: Sep 20 2022
Boston, MA
--
Boston, MA
Bid Date: Jul 20 2022
Boston, MA
Bid Date: Sep 14 2022
Boston, MA
--
Boston, MA
Bid Date: Sep 15 2022
Boston, MA
--
Boston, MA
--
Boston, MA
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.