Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Montreal, Quebec. Completed plans call for the renovation of a educational facility.
Reference number : 1447694 Deadline for receipt of complaints: 2021-02-15 Electronic submission accepted: Yes, in a single submission document Expected duration of the contract (in months): 10 Value of the Bid Security (amount or percentage) 10% OF THE TENDER AMOUNT The Universite de Montreal is issuing a call for tenders for services based on the lowest price award method in order to obtain the material for window and curtain wall replacement work to be carried out at Marie-Victorin Pavilion located at its Campus. The partial replacement of the masonry, which will be the subject of a subsequent call for tenders, is required for the partial replacement of the masonry, the demolition in order to accompany the replacement work of the windows and curtain wall. This call for tenders includes, but is not limited to: Sample book: o Installation of one (1) standard window as specified in the estimate of approximate size (to be checked on site) 995 mm wide x 1975 mm high (without opening shutter) fitted with a triple thermos glass as specified in the estimate . This window will serve as a model serving as a sample of the work. This window will remain in place temporarily and will be replaced during the work by a new complete unit as described in the architectural plans. This sample will serve as both an installation validation, an installation tolerance and the quality of the work required when carrying out work with the general contractor. Provide, in addition to the work provided for in the plans and specifications, the following steps and work in the tender; o Protection of interior installations. o The dismantling of a standard window easily accessible and located at ground level, o The installation of moldings covered with aluminum, nailing, insulation and sealing bases. o The cleaning at the end of the installation of the sample of the work, o Windows will be delivered in phases of 35 to 45 modular units (one unit being approximately 2 square meters each) per week. o The tenderer agrees to respect the installation sequences planned or modified by the general contractor in collaboration with the client's representative, During the supply and installation of the windows and the curtain wall, the general contractor will have the task; o The coordination and sequence of work in several phases, o The supply and installation of interior protection zones, o Dismantling of existing windows and evacuation off-site, Modifications to existing components required around openings, o The installation of the nailing bases necessary for the installation of the new window units, o Dismantling of the interior finish including plaster, shelves, masonry walls, o Reconstruction of the interior finish, o Supply and installation of scaffolds or other system required according to the specificity of the installations and according to the specific conditions on site. Period envisaged for the construction project under construction The execution period of the construction project is planned for a period of approximately 9 months. Contract (description of goods and services) See document DSUMP-5 FC-1 "Contract" for a description of the contractual clauses. A public call for tenders will be launched for the selection of a general contractor to carry out the construction work required for the window and curtain wall replacement project at the Pavillon Marie-Victorin. As soon as a contract is awarded to a general contractor, this contract will be assigned to him. The assignment of the contract, according to the current schedule, should be made around 2021-03-01; therefore during 4 months the manufacturing period, but before the installation of June 21, 2021 Estimated value of goods and services The estimated value of the contract is $ 2,600,000, before taxes. Quote See the window and curtain wall replacement technical specifications Plans, sketches, diagrams etc., See the construction plans for window and curtain wall replacement and the installation phasing plan Sample supply and installation requirement Quantity to be delivered minimum of 35 window units per phase consult the plans and specifications for quantities as well as the phasing plan. Budget and price model : See submission form Service to be provided: Supply and installation Handling, storage, installation at the tenderer's expense Schedule and date of delivery and installation Goods and services (delivery, installation and others) will be provided in 25 phases: Consult the 2/19 phasing plans to know the dates of each phase of the project Phase 25 of the 1 st May to 16 July 2021 Important note: Phase 24 must be carried out by a specific installation team at the start of the project assigned to the installation of the curtain wall. The installation of the windows of phases 1 to 23 will have to be assumed by different teams. These are the dates that will be used for the purposes of calculating penalties. The exact dates of delivery, installation and other work will be established in coordination with the general contractor and in collaboration with the University of Montreal as well as the person in charge of the work. Performance bond and materials and services of each corresponding 50% is required.
Award
Educational
$2,174,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2021
April 30, 2021
90 Vincent D'Indy Ave, Montreal, QC
Related To This Project
Montreal, QC
Bid Date: Jun 02 2021
Montreal, QC
Bid Date: Apr 22 2021
Montreal, QC
Bid Date: Jan 27 2022
Montreal, QC
Bid Date: Oct 16 2020
Montreal, QC
Bid Date: Sep 08 2020
Montreal, QC
Bid Date: Jan 24 2022
Montreal, QC
--
Montreal, QC
--
Montreal, QC
Bid Date: Jan 27 2022
Montreal, QC
Bid Date: Feb 11 2022
Montreal, QC
Bid Date: May 04 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.