BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in South Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of March 16 2021 project was awarded to Payne & Dolan bid amount of $1,076,652.85. Anticipated to start 6/1/2021. Site #613 207 Lake Drive South Milwaukee, WI Project Number: P701-20150 Contract 1: Access Roads & Parking Lots Reconstruction Work consists of pulverizing existing asphalt, re-grade, and provide new asphalt pavement, concrete walk, curb and gutter, pervious pavers, bio-filtration basins, and turf restoration as indicated in the project Bid documents. Project Completion: Work of the project shall be Substantially Complete as follows: Construction of the project shall begin by 6/1/21 (or earlier if possible), and shall be substantially completed by 8/27/21. All bidders must meet the minimum software requirements of the bidding website and be able to view, enter, scan and upload pdf files to submit a bid. Bidders who submit a bid shall obtain documents and be a plan holder of record at bid express. Bids from bidders who are not on the plan holders list will be rejected as being non-responsive. For further information contact 414-278-4861. Targeted business enterprise (tbe) participation goal for this project is 25 percent. To be considered for this project all required tbe-14 forms shall be completed and signed by prime and submitted as indicated in invitation to bid. Bidder's attention is called to the "Notice of requirements for affirmative action to ensure equal employment opportunity" (executive order 11246), contained in the bid documents, which set forth, in part, goals and timetables for the employment of women and minorities in the project area. Prime contractors shall be qualified prior to submitting a bid in accordance with chapter 43 of milwaukee county ordinance. Bidders shall submit the completed subcontractor-supplier information entry with the bid. Failure to submit this information with bid may result in rejection of the bid as non-responsive. A 10 percent bid bond or certified check is required with bid. The low responsive, responsible bidder will be recommended for contract award. Owner reserves right to reject bid, to waive informalities in bid or to accept bid which will be in best interest of Owner. Base Bid shall remain open to acceptance for a period of 60 days after bid due date.

Award

Roads / Highways

$1,076,653.00

Public - City

Paving, Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
82
Bidding Soon
1,524
All Active Projects
668
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2021

June 1, 2021

img_map_placeholder

207 Lake Dr, South Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.