BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Halawa, Hawaii. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

The scope of work for the Base Bid, located on Moanalua Freeway, Interstate Route H201 between the beginning of the freeway by Halawa (M.P. 0.00) and Kahuapaani St Overpass, consists of upgrading the highway lighting system to meet current AASHTO, State, and Federal lighting level standards. Associated highway lighting work includes the replacement of existing pole mounted street lights with new LED based street lights including providing a new light pole, pole base, and foundation, existing underpass lights with new LED based lights, conduits, and wiring. New LED based underpass lights are added to some overpasses that were not previously lit. Some of the associated structural and civil work includes modification of the median and retaining wall structures to accommodate new street lights, paving over the existing planter area with concrete, erosion control, traffic control, hydromulch seeding, and replacement and maintenance of the existing landscape affected by all the work. The estimated cost of construction is between $3,000,000 and $6,000,000. The scope of work for Additive Alternate #1, located on Moanalua Freeway, Interstate Route H201 between Kahuapaani St Overpass and the H-3 Overpass (M.P. 0.73), consists of upgrading the highway lighting system to meet current AASHTO, State, and Federal lighting level standards. Associated highway lighting work includes the replacement of existing pole mounted street lights with new LED based street lights including providing a new light pole, pole base, and foundation, conduits, and wiring. Some of the associated structural and civil work includes modification of the median and retaining wall structures to accommodate new street lights, erosion control, traffic control, hydromulch seeding, and replacement and maintenance of the existing landscape affected by all the work. The estimated cost of construction is between $3,000,000 and $6,000,000. The scope of work for Additive Alternate #2, located at the end of Halawa Heights Rd, consists of replacing the existing distribution center switchboard. Associated highway lighting work includes the replacement of electrical switchboard, panels, cabinets, lighting controls, conduits, and wiring. Some of the associated structural and civil work includes modification of the existing switchboard concrete pad, erosion control, hydromulch seeding, and replacement and maintenance of the existing landscape affected by all the work. The estimated cost of construction is between $500,000 and $1,500,000.

Award

Roads / Highways

$9,866,996.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
23
Bidding Soon
247
All Active Projects
96
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 14, 2021

October 18, 2021

January 16, 2023

img_map_placeholder

I-H-201, Halawa, HI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.