BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Santa Ana, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

**As of March 31, 2021, this project has been awarded. The anticipated start date and completion date has not yet been established.** The project includes excavation, cold mill, grading, removal & replacement of asphalt concrete pavement, the replacement of damaged sidewalk, curb gutter with curb drains repair, adjusting utility covers, adjusting survey monument frame and cover. Bid Bond- 10.00% Payment Bond- 0.00% Performance Bond- 0.00% Pre-Bid Meeting- No, Project Duration- 40 Working Days Liquidated Damages- $2,500 per calendar day Online Q&A- Yes Q&A Deadline- 02/20/2021 2:00 PM (PST) Contact Info- All Questions must be submitted in writing in PB Q&A It is recommended to opt for method with tracking mechanism for delivery. However, these documents are being used for verification and must exactly match scanned electronic versions that will already have been submitted by bid deadline (electronically).For hard copy drop offs, visitors must show photo ID at Ross Annex Reception Desk to be sent up to the 3rd floor for delivery at CIP Engineering. After 2pm, visitors must check in at City Hall Reception Desk for drop off.

Award

Roads / Highways

$305,598.00

Public - City

Paving, Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
0
Bidding Soon
1,872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2021

March 29, 2021

Project location map

N Flower St, Santa Ana, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.