BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a transportation facility in San Diego, California. Conceptual plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

As of July 6, 2022, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made or when construction is anticipated to begin. Closed solicitation has been included below for reference. ................ According to Federal Aviation Administration (FAA) Advisory Circular (AC) 150/5320-12C, Measurement, Construction, And Maintenance of Skid-Resistant Airport Pavement Surface, cutting or forming grooves in existing or new pavement is a proven and effective technique for providing skid-resistance and prevention of hydroplaning during wet weather. Grooving of all runways, serving or expected to serve turbojet aircraft, is considered high priority safety work and should be accomplished during initial construction. Such existing runways without grooving should be programmed as soon as practicable. Runway 10L-28R at Montgomery-Gibbs Executive Airport (MYF) is the primary runway at the airport and currently serves turbojet aircraft. The runway received a major renovation in 2012 but did not include grooving in the scope. This project will enhance airport safety by adding grooving to Runway 10L-28R. Runway 10L-28R is 4,598-feet long and 150-feet wide and is lighted with Medium Intensity Runway Edge Lighting (MIRL). It is an asphalt runway with a displaced threshold and precision instrument markings on 28R and basic visual markings on 10L. The full length and width of Runway 10L-28R shall be evaluated to determine if the existing pavement is suitable for grooving, and if not, what measures are required to make it suitable for grooving. Runway 10L-28R shall be prepared, based on the evaluation, then grooved. Existing light fixtures and signs shall be protected in-place. Following grooving, all debris shall be removed, and all runway markings shall be replaced in accordance with current standards. The City of San Diego has established a DBE goal for this contract of 10%. Estimate between $200K and $300K Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% If the Consultant has not met the DBE goal, the Consultant shall submit Good Faith Effort documentation, submitted in a searchable portable document format (PDF), demonstrating the Consultant made a good faith effort to outreach to and include DBE subcontractors to the City no later than 4:00 p.m. on the 4th Working Day after the Proposal due date. Pre-Bid Meeting- No, Online Q&A - No The method of contractor selection has not been determined at this time.

Conceptual

Transportation Terminals

$300,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2022

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.