BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Whittier, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 18, 2022, the project is anticipated to be awarded on May 08, 2022 City Council meeting. Renovation of the Whittier Greenway Trail Bridge on Norwalk Boulevard. The project includes: Traffic Control, lead-based paint abatement for steel bridge, bridge concrete abutment walls, and block walls, preparation and re-painting of the bridge steel and bridge concrete abutment walls and block walls, and preparation and re-painting of all the metal of the bridge including the handrails, in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2018 Edition and supplementary reference specifications under Special Provisions Caltrans Standard Specifications, all such work shall conform to the referenced portions of the technical provisions only of said reference specification. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee permit(s) for the project from the City of Whittier, Public Works Department. Engineers Estimate - $477,121 Each bid shall be made on the proposal form furnished by the City of Whittier herewith and shall be in accordance with the plans, specifications and other contract documents and shall be accompanied by a certified check, cashiers check or bidders bond, payable to City of Whittier in a sum not less than ten percent (10%) of the amount of the bid, as a guarantee that the bidder will enter into the contract for the work, the full amount of such guarantee to be forfeited to City of Whittier should said bidder fail to enter into said contract. The successful bidder will be required to furnish a Faithful Performance Bond in the amount of not less than one hundred percent (100%) of the contract price, a Labor and Material Bond in an amount of not less than one hundred percent (100%) of the contract price, said bonds to be secured from a surety company authorized to do business in the State of California, and to be subject to the approval of the City Attorney. The Contractor will also be required to furnish a certificate that he/she carries compensation insurance covering his/her employees upon work to be done under this contract, which may be entered into between him/her and City of Whittier for the said work. The Contractor shall commence ordering all necessary materials within ten (10) calendar days after notification that the contract has been executed and shall be completed within forty (40) working days after date set forth in the Notice to Proceed. If further information is needed regarding this work, please contact: Public Works Department, Monday through Friday from 8:00 A.M. to 5:00 P. M. at (562) 567-9500. Architect: CWA AIA Inc, 320 Arden Ave #210, Glendale, CA 91203, Attn: Stephen Finney AIA Magnolia Environmental appreciated having the opportunity to inspect your property. If you have any questions regarding this survey or other environmental hazards, please don't hesitate to contact us at (562)922-3144 or at Office@Magnoliaenvironmental.com. The Owner reserves the right to perform work on the project concurrently with the work of this contract. The Contractor shall coordinate his work with the work of others.

Bid Results

Bridges / Tunnels

$419,865.00

Public - City

Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
122
Bidding Soon
2,224
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

February 28, 2022

img_map_placeholder

El Rancho Dr & Norwalk Blvd, Whittier, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.