BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Site work, paving and new construction of a transportation facility in Winchester, Virginia. Conceptual plans call for the construction of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

This project will relocate taxiway “A” (approximately 5,500’ long by 35’ wide) within airport owned property to help achieve the overall goal to meet Federal Aviation Administration (FAA) airport standards for weather minimums and airport design criteria. This project is currently in the FY 2025-2030 CIP. As of March 24, 2026, further information regarding a design firm and timeline for construction has not yet been established.

Conceptual

Transportation Terminals

$16,218,888.00

Public - County

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
3
Bidding Soon
1,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

491 Airport Rd, Winchester, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.