BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Virginia Beach, Virginia. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project provides bus stop infrastructure improvements (shelters, benches, sidewalks, ADA access ramps, related earth work, roadway alterations, and potentially traffic control during construction) to increase accessibility, connectivity, and safety for HRT customers. According to HRT, a shelter, concrete pad, bench, and trash can in total cost about $20,000. An average of approximately $5,000 is allocated to construct necessary sidewalk/ramp improvements for ADA compliance. In some cases where right of way constraints is too great, benches alone will be installed, or land or easements may be acquired to the extent funding is available. It is envisioned funding will allow for improvements to 75 additional stops. The design phase consists of in-house layout of necessary improvements, with annual service engineering contract used for surveying and final design. Bus stop-selection for the improvements will be divided as follows: The initial 28 sites will follow the general recommendations of the 2014 Bus Infrastructure Study, based on stops with the highest ridership. The next 22 sites will focus on transit dependent focus points such as elderly, disabled, and affordable housing areas. The remaining 25 sites will focus on providing suitable amenities for other bus stops. Project is included City of Virginia Beach FY 2023 - 2028 CIP As of April 25, 2023, the design completion and firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$2,057,126.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
27
Bidding Soon
413
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2023

img_map_placeholder

Multiple Locations, Virginia Beach, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.