Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 7, 2021 at 8:00 PM
Updated October 24, 2023
Site work and renovation of a road / highway in East Lake, Florida. Completed plans call for the renovation of a road / highway.
substantially complete the project within three hundred and thirty-five (335) consecutive calendar days thereafter and to be fully complete within thirty (30) consecutive calendar days following substantial completion. Furnish all labor, materials, equipment, hardware, and incidentals to complete the Work specified within the Technical Specifications and Technical Drawings, which are part of this contract, associated with the Harbor Palms Infrastructure Project - Phase 2. The major elements of this Contract include the construction of new water mains including service connections and other appurtenances, replacement and upgrades to sidewalks and roadways, and upgrades to the underdrain. Work includes directionally drilling of high density polyethylene (HDPE) and open cutting of polyvinyl chloride (PVC) water mains, valves, and fittings; milling and resurfacing and full depth reconstruction of existing asphalt roads; pouring of concrete curb, gutters, driveways, and sidewalks; installation of new stormwater pipes as directed on the Drawings; grouting and filling of all abandoned piping; providing signs and thermoplastic street markings
Award
Roads / Highways
$3,443,910.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2021
April 8, 2021
Tampa Rd & Curlew Rd, East Lake, FL
Related To This Project
East Lake, FL
--
Dade City, FL
Bid Date: May 27 2021
Tampa, FL
Bid Date: Nov 04 2021
Sarasota, FL
Bid Date: Jul 26 2021
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
