BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Darien, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction of the 2021 Street Improvements in the Village of Darien includes four work areas located along Badger Parkway from the railroad tracks to Madison Street, the western access to West Park, the WalcoMet lift station parking lot, and the Department of Public Works parking lot. The Badger Parkway work area improvements generally consists of pulverizing the existing pavement, shouldering, ditch grading, removing and replacing storm sewer culverts, paving the roadway and ditch restoration. The West Park Access work area improvements generally consists of excavating to a uniform width an existing gravel drive, improving the drives access point with a concrete apron and asphaltic paving. The WalcoMet lift station parking lot improvements generally includes removing the existing asphalt area, adding additional asphalt area and paving the lot with an access point to the West Park Access. The Department of Public Works parking lot improvements generally includes improving the access points with concrete openings, concrete aprons into the existing buildings, removing and replacing existing sidewalks, pulverizing the existing parking lot, adding curb and gutter around a proposed landscape area, paving the parking lot, and planting landscaping trees and shrubs. Erosion control and traffic control are required for all work areas. \ Major work items and approximate quantities include: 2,600 tons of asphaltic pavement, 600 tons of base aggregate dense, 9,300 square yards of pulverizing asphaltic pavement, 280 square yards of concrete driveway, 1,100 linear feet of culvert pipe, 1,000 cubic yards of excavation, 1,100 linear feet of pavement sawcutting, and 4,000 square yards of restoration. Together with appurtenant construction, including traffic control and erosion control. \ Work associated with the Badger Parkway work area of the contract is a Wisconsin Local Roads Improvement Program (LRIP) MSILT Project. Procurement of the work and the award of the contract will be in accordance with the provisions of S.62.15, S.66.0901 and S.779.16, Wisconsin Statutes. Bid Security in the form of a certified check payable to the Village of Darien or a Bid Bond without condition to the Village of Darien in the amount of five (5) percent of the base bid shall be submitted with the bid as a guarantee that if the bid is accepted, a proper contract and bond will be executed and filed within 15 days after the acceptance of the bid. If such bidder fails to execute and file such contract, the amount of the check or bid bond shall be forfeited as liquidated damages. Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. The Village has the right to reject any and/or all bids received, to waive any minor defects or irregularities that may be found in the bids, and to accept the bid that is in the best interest of the Village. In accordance with the Advertisement for Bids, "all bidders must submit a Bidders Qualification Statement, four (4) days prior to bid opening, unless already on file with the Village or the Engineer. Failure to submit a Bidders Qualification Statement by the date noted is grounds for disqualification and/or rejection of bid." Bidders Qualification Statements are due Monday, February 22, 2021.

Bid Results

Roads / Highways

$398,979.00

Public - City

Paving, Site Work

43

1

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
92
Bidding Soon
2,115
All Active Projects
864
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2021

April 12, 2021

img_map_placeholder

Multiple Locations, Darien, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.