Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 22, 2021 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Hudson, Ohio. Completed plans call for site work for a bridge / tunnel.

The proposed work consists of the repair and re-sealing of the surface of the existing headwall, including wingwalls, installation of drainage behind the wingwalls, and all other associated work and site restoration at the Blackberry Drive bridge in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the City Engineer. The City of Hudson, Ohio reserves the right to reject any or all Bids, and to waive any nonconformities not involving price, time, or changes in the work. Questions shall be asked no later than March 2, 2021.

Award

Bridges / Tunnels

$72,740.00

Public - City

Site Work

9

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
140
Bidding Soon
2,609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2021

April 9, 2021

Project location map

Blackberry Dr, Hudson, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed