BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2021 at 7:00 PM

Updated October 19, 2024

Site work and paving for a mixed-use development in Clinton, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project consists of approximately 23,500 SY of 3" thick asphalt removal and replacement, 600 LF of curb and gutter replacement, 660 LF of sidewalk replacement, ADA pedestrian ramps, 7,650 LF of trail, and associated utility adjustments on various streets in Clinton City. Construction for shall be substantially completed by July 1, 2021 and final completion shall be by July 15, 2021. No pre-bid conference will be held. A five percent (5%) bid bond will be required.

Bid Results

Roads / Highways

$704,182.00

Public - City

Paving, Site Work

16

16

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
94
Bidding Soon
939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2021

April 2, 2021

Project location map

Multiple Locations, Clinton, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.