EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Buffalo Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project includes, but is not limited to, the following major work items: hot-mix asphalt surface pavement patching; and other appurtenant work on various street segments throughout the Village limits. State of Illinois, Department of Transportation, Contractor Pre-Qualification and Subcontractor Pre-Qualification/Registration is required. Bid security in the form of a Bid Bond, Bank Cashier's Check or Certified Check in the amount of Ten (10) percent of the total bid amount made payable to the Village of Buffalo Grove shall accompany the bid. This work is subject to the wage provisions of the Illinois Prevailing Wage Act. 820 ILCS 130/0/01 et seq. and the Illinois Substance Abuse Prevention on Public Works Projects Act. 820 ILCS 265/1 et seq relative to prevailing wages of laborers, mechanics, and other workers employed in any Public Works as amended by Public Acts 86799 and 86693. The Village of Buffalo Grove reserves the right to reject any and all bids and bidders and to waive all technicalities. All bid proposals submitted shall be valid for a period of one hundred twenty (120) days. The Village reserves the right to award to any bidder based on negotiation with any and all bidders after receipt of bids. The provisions of Article 104.02 of the Standard Specifications are hereby amended as follows: "The Village of Buffalo Grove (Village) expressly reserves the right to remove from or add to the project any portions thereof included in the 2021 Pavement Patching Project. Such reductions, if any, shall be made in writing by the Village prior to execution of the Contract Documents. Any reduction in the scope of work required by the Village prior to the execution of the Contract Documents shall not result in an adjustment to the contract or to the price originally bid."

Award

Roads / Highways

$277,891.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring
Division 10 - Specialties

Division 10 - Specialties

Fireplaces and Stoves, Storage Specialties, Lockers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
203
Bidding Soon
2,570
All Active Projects
1,240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2021

April 5, 2021

img_map_placeholder

Multiple Locations, Buffalo Grove, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Pavement Patching Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.