BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a water / sewer project in Gilroy, California. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Santa Clara County's Directive and State guidance regarding COVID-19 social distancing and face masks shall be followed when delivering bids and during bid opening. The City of Gilroy and SCRWA accept no responsibility if delivery is made to another location other than the location specified above and/or for delayed deliveries. This project consists of the expansion of an existing activated sludge treatment plant with a Membrane Bioreactor (MBR) facility which includes a new headworks including an intermediate pump station and screenings facility, aeration basins with aerobic and anoxic zones, bioreactors process trains, submerged membrane basins with membrane cassettes and filtrate pumps, blower building with aeration and air scour blowers and electrical building, chemical feed and storage facility, standby power facility with engine generator, above ground fuel storage and switchgear, solids handling facility with screw presses and new screw conveyor system, along with miscellaneous functional structures, yard piping, paving and site work needed to provide a complete project. Furnishing all labor and materials, equipment, and performing all work necessary and incidental to the construction of the project, as shown on the plans and described in specifications for this project, is to be completed within 752 working days from the date specified in the Notice to Proceed. The work of the contract documents comprises the provision of equipment, material, systems, and services for the Plant Capacity Expansion Project. The work consists of preconstruction and construction services including, but not limited to, engineering support, demolition, civil, architectural, structural, process mechanical, building mechanical, electrical, and instrumentation and controls work

Post-Bid

Water / Sewer

$5,700,000.00

Public - City

Addition, Demolition, Site Work

6

2

80

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
64
Bidding Soon
1,339
All Active Projects
505
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2021

June 7, 2021

img_map_placeholder

To Be Determined, Gilroy, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.