Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 2, 2021 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Baxter, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The S. West Reconstruction- Phase 1- Watson to Rippey project includes the reconstruction of S. West Avenue from W. Watson Street to W. Rippey Avenue. Utilities will be (re)constructed throughout the corridor including: sanitary and storm sewer. Sidewalk is to be constructed only on the west side of the corridor. The construction improvements include approximately 3,190 SY of 7" PCC, 3,690 SY of Modified Subbase, 375 SY of PCC sidewalk, 1,840 8" sanitary PVC truss pipe and 1,300 LF of RCP storm sewer (12"-48"), 590 LF of 48" RCAP storm sewer and 770 LF of subdrain. Other associated improvements include traffic control, erosion control, surface restoration, and miscellaneous associated work necessary to complete the project. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, in an amount equal to 10% of the amount of the bid, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Baxter, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Baxter. The bid shall contain no condition except as provided in the specifications. The City of Baxter reserves the right to defer acceptance of any bid for a period of thirty (30) calendar days after receipt of bids and no bid may be withdrawn during this period. The Contractor shall substantially complete the project within ninety (90) working days. Substantially complete shall be defined as all utility and grading construction being completed, with the new water main being tested, disinfected, and put into service. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not completed within the designated Contract term(s).
Award
Water / Sewer
$1,091,055.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2021
April 30, 2021
Multiple Locations, Baxter, IA
Related To This Project
Baxter, IA
Bid Date: May 14 2019
Baxter, IA
Bid Date: Mar 10 2025
Washington, IA
Bid Date: Jul 20 2021
Des Moines, IA
Bid Date: Nov 10 2021
Waterloo, IA
Bid Date: Aug 26 2021
Pella, IA
Bid Date: Mar 03 2022
Gilbert, IA
Bid Date: Aug 19 2021
Grinnell, IA
Bid Date: Aug 17 2021
Winterset, IA
Bid Date: Jul 20 2021
West Des Moines, IA
Bid Date: Sep 15 2021
Blue Grass, IA
Bid Date: Aug 31 2021
Waukee, IA
Bid Date: Jun 08 2021
Prairie City, IA
Bid Date: Oct 19 2021
Nevada, IA
Bid Date: May 13 2021
Toledo, IA
Bid Date: Jun 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.