BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Cumberland, British Columbia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The project scope encompasses the following three (3) main components, (1) Lagoon Upgrade, (2) Biochar Media R eed Bed and (3) Wetland Augmentation: 1. The Lagoon Upgrade is the primary focus of this project. The purpose is to bring the effluent into compliance with the current Permit and enable MWR compliant use of "Moderate Exposure Potential" reclaimed water. It includes the following scope: a. De-sludging the lagoons and on-site dewatering of the sludge. Processing to Class A will be offsite composting by the Comox Valley Regional District. b. Headworks area improvements - addition of a second in channel "Muffin Monster" screening system, storage, security, instrumentation, and flow measurement. c. Upgrades to (or replacement of) the existing influent pump station at the lagoons. d. Existing lagoon upgrades - repurpose the existing system, reverse the existing flow path, convert the existing larger settling lagoon into an aerated lagoon, and convert the smaller aerated lagoon to a settling lagoon with add baffle curtains to reduce the potential for hydraulic short circuiting. e. Addition of a chemically enhanced solids separation process for removal of phosphorus, non-settling suspended solids and algae. f. Provision for the later addition of disk filtration g. Addition of chemical disinfection by peracetic acid (PAA) or performic acid (PFA) to meet discharge standards. h. A new effluent outfall to Maple Lake Creek, and a creek stream gauging station. i. Addition of a sludge dewatering system for the solids from the separation unit - passive dewatering by geotubes is contemplated, but other systems can be considered. j. Process monitoring equipment, flow measurement, addition of SCADA (and integration with the Cumberland potable water SCADA system) etc. k. Chemical storage. l. Electrical upgrades. m. Operations building - laboratory, workshop, process control (SCADA) station, operator amenities, etc. This building may or may not include chemical storage and main electrical room - modular, self-contained options for these components (and the operations building itself) should be considered in the design process. n. Site servicing (stormwater, roads etc.) and security. o. Any other items identified as being necessary for a successful project.

Post-Bid

Water / Sewer

$9,700,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
52
Bidding Soon
1,811
All Active Projects
660
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 4, 2021

August 1, 2021

img_map_placeholder

To Be Determined, Cumberland, BC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.