Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a sidewalk / parking lot in Speedway, Indiana. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
***To be eligible to bid all contractors must obtain their own set of bid documents from American Structurepoint and be added to their plan holders list.*** Base bid work for which proposals are to be received includes construction of a gated parking lot with lighting. All questions related to obtaining bid documents shall be directed to Josh Rodgers via email or 317-547-5580. Bids shall be properly and completely executed on Bid Forms contained in the Contract Documents. Each Bid shall be accompanied by a proposal, itemized proposal, bid bond or certified check, a completely filled out Form No.96 (Revised 2013), list of proposed suppliers and subcontractors, list of bidder experience,non-collusion affidavit, and acceptable bid security. Any Bid not accompanied by the aforementioned required items shall be deemed to be a non-responsive Bid.No Bidder may withdraw the proposal within a period of 90 days fol-lowing the date set for the receiving of bids. The Speedway Redevelopment Commission reserves the right to retain any and all bids for a period of not more than 90 days and said bid shall remain in full force and effect during said time. The Speedway Redevelopment further reserves the right to waive informalities and to award the Contract to the Bidder providing the lowest responsible and responsive bid, all to the advantage of the Speedway Redevelopment Commission, or to reject all bids. Each bid shall be accompanied by an acceptable certified check made payable to the Speedway Redevelopment Commission or an acceptable bid bond in the amount equal to five percent (5%) of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears of the current Treasury Department Circular 570.BONDS: A Performance Bond and Payment Bond each in the amount of 100 percent of the Contract price will be required from the Contractor to whom the work is awarded. The OWNER shall retain ten percent (10%) of the amount of each payment untilfifty percent (50%) of the work is complete. Retainage amount being held is not to exceed five percent (5%) of the total contract amount. On Commission completion and acceptance of a part of the Work on which the price is stated separately in the Contract Documents, payment may be made in full, including retained percentages, less authorized deductions. The bidder is required to sign the Non-Collusion Affidavit as set forth in the contract documents. :Standard Questionnaire Form 96 - Revised 2013, completely filled out and signed, including attachment of Contractor's Financial Statement.
Post-Bid
Sidewalks / Parking Lot
$500,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2021
April 9, 2021
4940 Crawfordsville Rd, Speedway, IN
Related To This Project
Speedway, IN
Bid Date: Oct 13 2020
Speedway, IN
Bid Date: Jun 04 2020
Speedway, IN
Bid Date: Mar 07 2019
Speedway, IN
--
Speedway, IN
Bid Date: Feb 02 2024
Speedway, IN
Bid Date: Jan 18 2022
Speedway, IN
Bid Date: Mar 04 2022
Speedway, IN
Bid Date: Dec 17 2021
Speedway, IN
Bid Date: Nov 24 2021
Speedway, IN
Bid Date: Jul 12 2023
Speedway, IN
Bid Date: May 22 2023
Speedway, IN
Bid Date: Apr 28 2023
Speedway, IN
Bid Date: Apr 18 2023
Speedway, IN
Bid Date: Feb 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.