BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wapello, Iowa. Completed plans call for site work for a water / sewer project.

The project shall consist of providing all materials, equipment and labor necessary to install the work as defined as follows: Base Bid: Painting Bowl Interior (immersed and non-immersed area); Lump Sum; Alternate A: Painting Tower Exterior and Interior Non-immersed Areas, Lump Sum; Alternate B: Tower Manway Rehabilitation, Lump Sum. Work includes all necessary traffic control, mobilization and other associated appurtenances and miscellaneous work items. All Work and equipment is to be in accordance with the Plans, Specifications and Contract Documents on file with the City Clerk of the City of Wapello, Iowa, which are by this reference made a part of this Notice as though fully set out and incorporated herein. The Bidder is eligible to receive an exemption from the State of Iowa Sales Tax. The City expects the Contractor to obtain the Sales Tax Exemption from the City. State of Iowa Sales Tax shall NOT be included in the bid. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa. Bid security in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a bidder's bond with corporate surety satisfactory to the City, in the amount of 10% of the bid. Work shall commence within ten (10) calendar days after receipt of the written "Notice to Proceed". All work shall be completed by October 1, 2021 subject to any time extension that may be granted by the Council. One hundred percent (100%) of the bid, with a maintenance period of three (3) years from the time of final project acceptance by the Owner. Monthly estimates equivalent to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month with 5% retainage. Remaining retainage, if any, will be paid within 30 days after final acceptance by the City.

Award

Water / Sewer

$192,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
26
Bidding Soon
424
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2021

May 3, 2021

img_map_placeholder

To Be Determined, Wapello, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.