BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Minneapolis, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruct Minnetonka Boulevard (CSAH 5) from TH 100 to France Avenue in the City of St. Louis Park. The existing roadway (last reconstructed in 1952) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The existing sidewalk facilities are located immediately adjacent to the roadway; causing a feeling of discomfort for people walking. The curb has experienced settling, diminishing its ability to collect water and define the roadway edge. The corridor also lacks catch basins, relying on the local storm sewer system to properly manage water in the area. Many intersections include ADA accommodations that do not meet current design requirements, causing challenges for persons with limited mobility. Additionally, county staff has received numerous complaints from residents regarding safety due to the 4-lane undivided nature of the roadway. The proposed project would include new assets, including: pavement, curb, storm water structures, sidewalk, and traffic signals. It is anticipated that a 3-lane typical section will be considered in an effort to better facilitate vehicle turning movements and provide traffic calming. Specific pedestrian crossing enhancements (such as curb extensions, raised medians, and crossing beacons), bikeway accommodations, and streetscaping features will also be considered in an effort to benefit people walking and biking. Furthermore, this project presents an opportunity to improve the transition for westbound users as they access Minnetonka Boulevard from West Lake Street. This project will complement the proposed Southwest Light Rail Transit (SWLRT) Project as it is located within close proximity to the Beltline Boulevard and West Lake Street LRT Stations. Improvements for people walking and biking will improve first/last mile connections for non-motorized users. At this time, it is anticipated that the SWLRT service will begin operation in 2023. As February 16, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$11,500,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
47
Bidding Soon
778
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2024

img_map_placeholder

Minnetonka Blvd, Minneapolis, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.