BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Garner, North Carolina. Completed plans call for site work for a road / highway.

The City of Raleigh Water Treatment Division is soliciting bids for the installation of a Precast Flow Meter Vault on the Raw Water Line at the existing Raw Water Pump Station. The Raw Water Line will remain in service throughout the installation. This is the only source supply pipe for the D.E. Benton Water Treatment Plant so the installation must be performed in a manner that does not interrupt the single source raw water supply to the plant. The contractor will be responsible for the excavation, meter vault installation, run all the required conduits specified in the scope of work, and for the asphalt repairs. The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary for the installation and asphalt repairs. This is a general discretion of work. Refer to the contract documents for the full detail and scope. o Provide and install the precast concrete vault. The contractor shall supply the crane, rigging, labor, and all tools required. o Install electrical duct bank from the vault to the building. o With the vault properly in place, the backfilling process can begin. Using project approved backfill material, fill in the void between the vault and the existing ground. o Asphalt: Saw cut and remove the existing asphalt paving in the areas required for the vault installation. o Backfill and compact to 95% compaction. o Install new asphalt matching the thicknesses of the existing paving. All the excavated material, debris, and waste shall be removed from Raw Water Pump Station property and disposal of in an approved landfill. Contractor's Written Questions Due March 8, 2021 4:00 P.M All questions should be emailed to francisco.torres-garcia@raleighnc.gov by the question deadline. Questions and/or inquiries past the contractor's written question due date deadline will not be received. PROJECT TIMELINE Three (4) months from Notice to Proceed. The City of Raleigh reserves the right to reject all bids without providing a reason. The City of Raleigh has a goal of 15% MWBE participation.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
58
Bidding Soon
1,195
All Active Projects
442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.