BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Madison, Wisconsin. Completed plans call for site work for a water / sewer project.

This contract shall include the trenchless rehabilitation of approximately 14,734 linear feet of sanitary sewer pipelines ranging in size from 8" to 36" diameter using Ultraviolet light cure CIPP system. Rehabilitation of the sanitary sewer shall be without excavation by the installation of a resin-impregnated flexible tube which, when cured, shall be continuous and tight fitting throughout the entire length of the original pipe. The CIPP shall extend the full length of the original pipe and provide a structurally sound, jointless and watertight new pipe within a pipe. All service connections to buildings shall be reinstated without excavation, utilizing a remote controlled cutting device, monitored by a video TV camera. The Contractor is responsible for proper, accurate and complete installation of the CIPP using the system selected by the Contractor and approved by the Engineer. Neither the CIPP system, nor its installation, shall cause adverse effects to any of the City of Madison's processes or facilities. The use of the product shall not result in the formation or production of any detrimental compounds or by-products at the wastewater treatment plant. The Contractor shall cleanup, restore existing surface conditions and structures, and repair any of the CIPP system determined to be defective. The Contractor shall conduct installation operations and schedule cleanup in a manner to cause the least possible obstruction and inconvenience to traffic, pedestrians, businesses, and property owners or tenants. The specific pipe sections that are included in the scope of this contract are identified in the Detailed Lining Limits shown on the accompanying plan set. SBE PRE BID MEETING: Small Business Enterprise Pre-Bid Meetings are not being held in person at this time. Contractors can schedule one-on-one phone calls with Juan Pablo Torres Meza in Affirmative Action to count towards good faith efforts. Juan Pablo can be reached at 608-261-9162 or by email, jtorresmeza@cityofmdison.com.

Award

Water / Sewer

$1,044,330.00

Public - City

Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
59
Bidding Soon
972
All Active Projects
438
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2021

May 10, 2021

img_map_placeholder

Multiple Locations, Madison, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.