BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Vancouver, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

County: Clark & Cowlitz For additional information on this project, please direct your inquiries to the Project Engineer: Name: Mike Briggs, P.E. Email: SWGORGEQUESTIONS@wsdot.wa.gov Contains Apprentice Utilization (CL 4, $5,000,000 - $7,500,000) Contains Voluntary MSVWBE Goal: 26%. A State Project on I-5, MP 18.28 to MP 20.00. Requires: cracking and seating the existing concrete panels and overlaying lanes and shoulders with 0.75' of HMA, replacing existing underdrain system, modifying existing electrical system, installing wetland buffer mitigation improvements, replacing existing guardrail and high-tension cable barrier, replacing pavement markings, traffic control and other work. 60 working days. Involves 79 items. 4300 CY rdwy excav incl haul, 5804 LF underdrain pipe, 24 EA underdrain pipe cleanout, 8790 T CSBC, 29780 SY crack and seat exist PCCP, 4510 SY plane bit pvmt, 23340 T HMA CL 1/2 IN PG 58-H-22, 4410 T HMA CL 3/8 IN PG 58-V22, 3390 SY compost blanket, 3200 LF coir log, 7783 LF high vis silt fence, 4588 LF beam guardrail, 1210 LF high-tenson cable barrier sys 4 cable, 18460 LF paint line, 18460 LF profiled plastic line, 2 MI shoulder rumble strip, 101530 LF temp pvmt marking -long duration, 2400 HR other traffic control labor, 92 SF const sign CL A, 504 HR operation of smart work zone, 633 CY struct excav CL B incl haul, 325 CY gravel backfill, 3120 SY geogrid for pvmt base reinforce. Lump Sum Bids for: Erosion control and water pollution prevent, additional high-tension cable barrier components, other temp traffic control, elec mod, smart work zone sys mobilization, e-ticket sys, health & safety plan, SPCC plan. WSDOT - I-5 , SB E Fork Lewis River to N Fork Lewis River Concrete Pavement Rehab Voluntary MSVWBE Participation Goals 25 Goals for voluntary MSVWBE participation have been established as a percentage 26 of Contractors total Bid amount. 27 28 The Contracting Agency has established the following voluntary goals: 29 30 Minority 10% 31 Small 5% 32 Veteran 5% 33 Women 6%

Award

Roads / Highways

$5,716,127.00

Public - State/Provincial

Paving, Site Work

54

10

2

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
25
Bidding Soon
552
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2021

July 12, 2021

img_map_placeholder

I-5, Vancouver, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.