EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a educational facility; and for site work for a playground / park / athletic field.

The Contractor shall complete all work necessary for substantial completion within 789 calendar days from receipt of the Notice to Proceed The Fund's project specific goals for this project are 17% MBE and 13% WBE and 6% SDVOB. See Section 00 21 13 30 MWBESDVOB Utilization Plan Instructions dated Nov 2023. Utilization Plans shall be accepted in the ONLINE FORMAT ONLY using the Fund's web-based application; any other form of submittal will be rejected. All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to State Finance Law for 100% of the amount of the Contract. The Fund reserves the right to reject any or all bids.

Bid Results

Educational

$4,939,000.00

Public - State/Provincial

Renovation, Site Work

216

38

6

7

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Periodic Work Observation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Structural Panels
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Natural Roof Coverings, Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Metal Furring, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Athletic and Recreational Surfacing, Tennis Court Surfacing, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Manufacturing Equipment, Machining Equipment, Grinding Equipment, Finishing Equipment, Grinding Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
529
Active Projects
313
Bidding Soon
5,084
All Active Projects
2,378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

December 23, 2024

img_map_placeholder

394 Lenox Rd, New York, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rehab Building Envelope - Student Activities Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.