BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a transportation facility in Akron, Ohio. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

Contract Duration: Not to Exceed 25 Calendar Days City of Akron Local Goal..18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% VIBE} The proposed project includes lighting and signage Improvements to Taxiway Connectors A, B, C, D. and E at the Akin Fulton Airport. The protect includes the removal and installation of the lighting infrastructure along the taxiway connectors including LED edge lighting and signage along with new cable arid conduit installation. ach Proposal must include a detailed plan to meet or exceed the City local EDGE/DBE/MBE/WBE/SBE/VBE Firm goals set forth above. The final agreed upon plan will be attached to the Agreement as an exhibit and the selected Proposer shall be obligated to comply with said plan All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project- Domestic steel use requirements as specilied in Section 153.11 of the Ohio Revised Code apply to this ProjecL Copies of Section 153.011 of the Ohio Revised Code can be obtained from the Ohio Department of Administrative Services. Except as provided in Section 102.07 of the Oily of Akron, Construction and Materiels. Specilicallons. 2(K Edition. each proposal must be accompanied by a certified oheol< in the sum of 5% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City 01 AlirOn, as a guarantee, that if the proposal is accepted, a contract will be entered into_ Proposals may be held by Oily for a period not to exceed one hundred twenty 020) days after the date Proposals are opened or the purpose of reviewing the Proposals and investigating the qualifications of Proposers prior to awarding the Agreement. Except as provided in Section 34.09 of the Gits Code of Ordinance, the Proposer to virhom the Acpeernen1 is awarded will be required 10 furnish a performance and payment bond in the sum of 100% of Vie Contract Price for the faithful performance of the contra11. The performance and payment bond shall remain in fall effect until FirMi Completion of the Project. The Director of Public Service reserves the right to reject any or all bids. and 10 waive informalities. The City al Akron ig committed to ensuring that individuals with disabilities are able to lolly participate in public programs, services., and activities. Anyone who is in need of an accommodation from any City department is invited to contact Donald Pico, director of Human Resources, 1 South High Street, Municipal Building, Suite 103, Akron, Ohio 44308. (voice) 330-375-2780 as soon as possible. If you require TAD phone service call Ohio Relay at 800-750-0750 and they will assist in contacting the Department of Human Resources at 000) 375-27811 NONDISCRIMINATION IN EMPLOYMENT Bidders mast use the prepared forms provided therefore which include compliance with Seclion 84.03 of the Codified Ordinances ol the City of Akron, Ohio regarding public oontracts. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 the Governor's Executive Order of 1972, and Cool:limes Executive Order 84-9 shall be required

Post-Bid

Transportation Terminals

$547,065.00

Public - City

Outdoor Lighting, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
136
Bidding Soon
2,268
All Active Projects
982
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 10, 2021

June 8, 2021

July 2, 2021

img_map_placeholder

1600 Triplett Blvd, Akron, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.