BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tukwila, Washington. Completed plans call for site work for a water / sewer project.

1. Document 00 43 70 - Subcontractor Work Listing and Document 00 89 00b - Women and Minority Business Enterprise Commitment Plan Form shall be completed and submitted with the Bid or within one (1) hour after the published Bid submittal time. 2. Each bid must include a bid guarantee in the form of a cashier's check, money order, or surety bid bond, in an amount not less than five percent (5%) of the total bid, made payable to Port of Seattle. A copy of the bid guarantee shall be provided electronically with your bid. Original bid guarantees shall be sent to Todd Rehm, Port of Seattle, 17900 International Blvd., Suite 400B, Seatac, WA 98188 no later than 10 calendar days after the bid opening due date and time. 3. Bids shall include the solicitation number, title, due date and time in the email subject line. 4. The Port's e-mail server will not accept files larger than 10 MB. If files are larger than 10MB, proposers should send multiple e-mails with the information as set forth in the solicitation above as well as the total number of e-mail s submitted by the Bidder. Work includes: Project provides and installs new Total Organic Carbon (TOC) analyzers to be used to estimate th e level of Biological Oxygen Demand (BOD) in industrial waste flows captured from the airport operations area south basin (Manhole 1017) and the airport operations area north basin (Manhole 489). The TOC analyzers will be housed in the existing IWS pump station with provisions to install future analyzers. Sample pumps are installed upstream of a new concrete baffle wall constructed in each manhole. Each concrete baffle wall contains a flushing gate to create a pool for pumping when closed and to flush gri t and solids into the treatment basins when open. The baffle wall in MH1017 will be provided with 90-degree V-notch weir and will utilize the pump control level transducer to measure approximate flow over the weir. Materials and installation within manholes shall comply with Class 1, Div. 1 requirements. The Engineer's estimate range for this project is $1,200,000 - $2,400,000. Performance and Payment bonds will be required with the Contract. Time limit for substantial completion of the work is 180 calendar days. In support of the WMBE community, the Port has established a WMBE utilization goal of 10% fo r this contract.

Post-Bid

Water / Sewer

$2,400,000.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
42
Bidding Soon
863
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2021

May 26, 2021

img_map_placeholder

To Be Determined, Tukwila, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.