BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Pearl City, Hawaii. Completed plans call for the renovation of a municipal facility; and water / sewer project.

The work consists of selective demolition and new work only. Refer to the drawings for more detailed information. The work consists of, but is not limited to, selective demolition work to include certain slabs/pads/piers, concrete, chillers, heat pump water heaters, cooling towers, fan, chilled water pumps, condensing water pumps, reheat water pumps, expansion tanks, separators, controls, water tanks, various piping systems, insulation, luminaires, electrical main switch, panels, wiring, conduits, circuit breakers, and all incidental accessories, hardware, and supports as indicated or described in drawings, and miscellaneous related work. New work to include modification of existing or installation of certain new concrete housekeeping equipment pads, patching floor cracks, coring through existing wall; installation of new chillers, heat pump water heaters, hot water boiler, chilled water pumps, expansion tank, separators; condensing water pumps, cooling towers, exhaust fan, ductwork, chemical treatment for the various water system; various piping systems, insulation, DDC controls system, new electrical panels, conduits, circuit breakers, luminaires, and all incidental accessories, structural supports, and hardware as indicated and specified hereinafter, and miscellaneous related work. Provide power and power outlets for all new mechanical equipment and their control devices. Paint the mechanical room floor, all new exposed items and some existing exterior surfaces as indicated on drawings. The estimated construction cost is between $5 million and $10 million. The estimated value of the public works contract is $250,000 or more and the apprenticeship agreement preference pursuant to Hawaii Revised Statutes 103-55.6 (ACT 17, SLH 2009) shall apply. If awarded a contract in response to this solicitation, offeror agrees to comply with HRS section 11-355, which states that campaign contributions are prohibited from a State and County government contractor during the term of the contract if the contractor is paid with funds appropriated by the legislative body between the execution of the contract through the completion of the contract.

Award

Municipal

$6,414,500.00

Public - State/Provincial

Renovation

81

16

15

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
3
Bidding Soon
88
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2021

May 24, 2021

img_map_placeholder

2725 Waimano Home Rd, Pearl City, HI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.