BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

For Nueva Street Marina Fabridam Replacement The Nueva Street Marina Dam is a Bridgestone Fabridam, which is no longer being manufactured. The existing gate was installed in the mid-1980s and is approximately 30 years old, with a serviceable life of 30 years. The construction scope includes removal of the current Fabridam, retrofitting the existing dam body, installing an air-filled rubber dam system, concrete foundation, control room housing mechanical and electrical equipment (including air blower/water pump, and/or inflation and deflation mechanisms), and inlet/outlet piping to an air-filled dam replacement in place of a water-filled dam. The dam is owned by the City of San Antonio and the River Authority is managing the project for the City. Questions Due Date: Jan 4th 2022, 11:00 AM CST

Award

Water / Sewer

$647,647.00

Public - City

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
121
Bidding Soon
2,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.