BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 6, 2021 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bridgewater, Massachusetts. Completed plans call for site work for a water / sewer project.

**As of April 6, 2021. the project has been awarded with the amount of $330,132.67.** The Work under this contract includes, but is not necessarily limited to, the installation of approximately 1,550 linear feet of new 8-inch PVC water main on Curve Street between the eastern intersection with Auburn Street and the access road to the solar panel farm, as well as the replacement of approximately 900 linear feet of existing asbestos cement water main with new 8-inch PVC water main from approximately #143 Curve Street to the access road to the solar panel farm. The work also includes hydrants, valves, water services, trench pavement, trench mill and overlay, and all necessary and incidental appurtenances required to complete the work. This includes all work for both the Base Bid and the Bid Alternate. Estimated Cost $525,000 Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. **General Bid Date and time (03/18/2021 at 2:00 PM ET) in GC project ALL CONSTRUCTION EXCLUDING TRENCH MILL AND OVERLAY MUST BE COMPLETED BY JUNE 30, 2021.

Award

Water / Sewer

$330,133.00

Public - City

Site Work

11

1

7

8

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
183
Bidding Soon
3,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2021

April 19, 2021

Project location map

Curve St, Bridgewater, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.