BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Fargo, North Dakota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bids must be in a sealed envelope plainly marked Sidewalk & Shared Use Path Rehab/Reconstruction, Project No. SR-21-A1 and attached to the outside of the bid envelope must be A SEPARATE ENVELOPE CONTAINING A LIST OF ALL ADDENDA TO THE PLANS AND SPECIFICATIONS AND AN ACKNOWLEDGEMENT BY THE BIDDER OF RECEIPT OF SUCH ADDENDA. THE SEPARATE ENVELOPE SHALL ALSO CONTAIN A BIDDER BOND IN THE AMOUNT OF 5% OF THE FULL AMOUNT OF THE BID executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within 10 days after notice of award, shall execute a contract in accordance with the terms of the bid and a contractor's bond as required by law and the regulations and determinations of the governing body. Countersignature of a bid bond is not required under this section. All bidders, except a bidder on a municipal, rural, and industrial water supply project authorized for funding under Public Law No. 99-294 [100 Stat. 426; 43 U.S.C. 390a], must be licensed for the full amount of the bid, as required by Section 43-07-05. A copy of the Contractor's License or Certificate of Renewal thereof, issued by the Secretary of State, must be enclosed in the bid bond envelope as required under Section 43-07-12. No bid may be read or considered if it does not fully comply with these requirements and any deficient bid submitted must be resealed and returned to the bidder immediately. Plans and specifications are also on file in the office of the City Engineer and the City Auditor, City Hall, Fargo, North Dakota, where they may be examined by any interested person. A. Project Completion Substantial Completion Date: September 10, 2021 Final Completion Date: October 1, 2021 Final Completion shall include punchlist items and cleanup. Failure to meet completion date will result in liquidated damages being applied per the contract. B. Interim Completion New Sidewalk Area #29 (18 th Street South): Interim Completion Date: August 13, 2021 For Area #29, the Contractor will not be allowed to begin working until June 7, 2021. Failure to meet the interim completion dates and stipulations for Area #29 will result in an interim completion penalty for $500 per calendar day until all work is complete.

Award

Sidewalks / Parking Lot

$834,705.00

Public - City

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
120
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2021

June 7, 2021

img_map_placeholder

Multiple Locations, Fargo, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.