BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Duluth, Minnesota. Working plans call for site work for a water / sewer project.

Repair and rebuild 1,175 feet of failing dock wall on Berth 11 at the Clure Public Marine Terminal in Duluth. As of July 26, 2022, a design schedule has been provided indicating an construction bid package scheduled for August 2022 with construction is slated to begin in October 2022; however, the firm timeframes has not been disclosed.

Final Planning

Water / Sewer

$10,500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
26
Bidding Soon
267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2022

Project location map

To Be Determined, Duluth, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.