Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 27, 2021 at 8:00 PM
Updated November 15, 2023
Demolition, site work and addition to a civil project in Middleville, Michigan. Completed plans call for site work for a water / sewer project; for the addition of a water / sewer project; and for the demolition of a water / sewer project.
Question Acceptance Deadline 03/18/2021 05:00 PM EDT Questions are submitted online No The work includes; two (2) SBR tanks, sludge storage tank expansion, three (3) blowers, two (2) waste sludge pumps, removal and replacement of equipment in two (2) existing SBR tanks, rehabilitation of RIB #3, vactor truck dump pad, solids removal from polishing pond, site utility, chemical feed pumps, electrical and controls work, process mechanical work, HMA work, concrete flatwork, site grading, excavation, fencing and restoration work. General Requirements - Bid Deposit Required - Insurance Required If you have any questions in regard to the mandatory pre-bid meeting please contact Trenton Morris, Midwest Engineering Group, Inc, at tmorris@midwest-engineers.com or 417-825-9678. Contractor has 335 calendar days from Notice to Proceed date for substantial completion and completed and ready for final payment within 395 days.
Award
Water / Sewer
$3,773,876.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2021
June 7, 2021
207 Sheridan St, Middleville, MI
Related To This Project
Middleville, MI
Bid Date: Oct 26 2023
Middleville, MI
Bid Date: Dec 20 2023
Middleville, MI
Bid Date: Feb 14 2024
Middleville, MI
Bid Date: Jan 30 2024
Middleville, MI
Bid Date: Mar 01 2024
Middleville, MI
Bid Date: Mar 06 2024
Middleville, MI
Bid Date: Feb 22 2024
Middleville, MI
Bid Date: Mar 19 2024
Middleville, MI
Bid Date: Jan 18 2022
Middleville, MI
Bid Date: Aug 04 2023
Middleville, MI
Bid Date: May 02 2023
Middleville, MI
Bid Date: Mar 24 2023
Middleville, MI
Bid Date: Mar 03 2023
Middleville, MI
Bid Date: Feb 24 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
