BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Burlington, Vermont. Completed plans call for site work for a playground / park / athletic field.

Question due March 23rd 2021 By 4:00 PM Starr Farm Park is a large community-scale park that contains multiple athletic fields, a dog park, playgrounds, large community gardens, and natural woodlands. The Burlington Greenway passes transects the park. BPRW seeks a contractor to construct an approximately 1,000 SF exposed-aggregate concrete pad that will serve as the foundation for future exercise equipment and to install three (3) 13'x 16' concrete pads at the three entrances to the Dog Park, replacing recently installed compacted stone-screening landings All bids must be accompanied by a negotiable bid guarantee which shall not be less than five percent (5%) of the amount of the bid. See Section VII for detailed Bid Bond conditions. Questions due: Monday, March 15, 2021 by 5:00 PM Responses Posted: Friday, March 19, 2021 by 5:00 PM 1. Excavation of topsoil and subsoil for exercise station pad 2. Setting up temporary barriers at the entrances to the Dog Park; 3. Excavation of compacted stone screening pads at entrances to Dog Park; a. Removed stone screenings shall be stockpiled on-site. BPRW staff will be responsible for transporting excavated screenings to a final storage location. 4. Temporary removal and reinstallation of fence fabric and gates; 5. Protection or removal and replacement of fence posts a. Any fence posts damaged or removed as part of the project shall be replaced by the contractor 6. Site grading and layout; 7. Installation and compaction of gravel subbase; 8. Installation of exposed aggregate concrete pads; a. Includes expansion joints, control joints and concrete sealant 9. Installation of topsoil, seed, and mulch on any areas of exposed soil or disturbance. a. Reuse topsoil excavated for the project. b. Mulch with erosion control blanket

Award

Playgrounds / Parks / Athletic Fields

$32,600.00

Public - City

Site Work

6

3

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
71
Bidding Soon
1,158
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2021

April 28, 2021

img_map_placeholder

224 Starr Farm Rd, Burlington, VT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.