BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a water / sewer project in Marysville, Kansas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Project consists of the construction of the Miami RWD #2 Water Treatment Plant Expansion - Phase 1 will generally include the following but will not be limited to: mobilization of facilities, equipment and materials; construction staking; clearing and grubbing; demolition, earthwork, excavation, sorting and stockpiling of material within project area; construction of temporary and permanent parking lots, entrances and roads; installation and maintenance of erosion control devices; construction of drainage diversion; demolition of existing lagoons and construction of new lagoon system with piping, embankment, liner, riprap, structures and fencing; excavation of clearwell complex area; construction of process waste piping; construction of retaining walls; construction of Pre-sedimentation Basin's earthen pad; construction of Pre-sedimentation Basin No. 1 with chemical feed conduits and manholes; removal of existing site piping and installation of new raw water piping; installation of supernatant return pump station and piping; and finish grading, seeding and mulching. Contract Documents may be purchased from the Issuing Office: Drexel Technologies, 10840 West 86th Street, Lenexa, Kansas 66214-1632, (913) 371-4430.

Award

Water / Sewer

$5,085,000.00

Public - County

Addition, Demolition, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
47
Bidding Soon
672
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2021

May 10, 2021

img_map_placeholder

W 253rd St & Harmony Rd, Marysville, KS

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.