BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Grattan, Nebraska. Completed plans call for site work for a bridge / tunnel.

The projects are referred to as "Holt County 2021 Culverts, Group 1: C-45(526) and C-45(527)" and shall include all labor, materials, transportation and equipment required for the construction of: C-45(526) - Site 1 - triple 60" x 53' corrugated metal pipes on a 40 degree skew (LHB); Site 2 - twin 60" x 45' corrugated metal pipes on a 10 degree skew (LHB); Site 3 - a 60" x 45' corrugated metal pipe on a 10 degree skew (RHB) with a 1-5 degree elbow; C45(527) - twin 96" x 106' corrugated metal pipes on a 10 degree skew (LHB) with a paved sloped inlet apron, all with steel headwalls and wingwalls and other related incidental work. For the construction of corrugated metal pipes with steel headwalls and wingwalls, and other related incidental work at four sites. The project sites are located as follows: C-45(526) - Site 1 - on Road 889 between 487 Ave and 488 Ave; Sites 2 and 3 - on 488 Ave between Road 888 and Road 889; C-45(527) - on 486 Ave between Road 885 and Road 886, all in Holt County, Nebraska. The desired completion date for all sites is September 30, 2021. The Contractor will be allowed fifty (50) calendar days for C-45(526) and forty (40) calendar days for C-45(527). The required completion date for each project will be the earlier of the dates indicated in the bid proposal or the actual start date plus the allotted calendar days for that project. Additional days due to weather may be granted at the discretion of the Engineer. No project can be started without the intent to complete that project without delay from the other project, therefore, the Contractor will not be allowed to start the removals for a project unless they have committed a crew to complete the work at that project. The Contractor may close the road for all three sites for project C45(526) at the same time and construct all three sites simultaneously. Within ten (10) days following the award of the Contract, the successful bidder shall furnish a surety bond or bonds in an amount equal to or greater than the full amount of the contract. The surety and form of the bonds are subject to the acceptance by the Holt County Board of Supervisors. Holt County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Dept of Transportation, Subtitle A, Office of Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Dept of Transportation issued pursuant to such Act, hereby notifies all bidden that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin, sex, age and disability/handicap in consideration for award. Holt County is an Equal Opportunity Employer. The Holt County Board of Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids received.

Award

Bridges / Tunnels

$500,942.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
115
All Active Projects
50
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 16, 2021

April 15, 2021

September 30, 2021

img_map_placeholder

Multiple Locations, Grattan, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.