BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Savannah, Georgia. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Project scheduling, coordination requirements, disadvantaged business participation, and questions of interpretation will be addressed at this time. Please contact Johnnie Coker at 912-651-6424 or jcoker@savannahga.gov to receive an invitation. Upgrade the existing two 48" RCP culverts under bothNorth and South Thompkins Blvd to two 10'x5' box culverts. The length ofthe proposed double box culvert is 64 linear feet at North Thompkins and 70 linear feet at South Thompkins. The Base Bid includes precast box culverts. Alternate 1 includes cast-in-place box culverts. The pre-cast box culvert must utilize a "watertight" ASTM C1677 joint in lieu ofthe "soil tight" ASTM C990 joint that has typically been utilized locally. The cast-in-place box culvert must utilize expanding waterstop in addition to the GDOT specified exterior waterproofing. The double box culverts will be bear on a geotextile and 12 inches of #57 stone. The project will include cast-in-place wing walls and aprons. New stormwater pipes and manholes as well as modification of existing pipes will be included at each crossing. Stormwater curb inlets will be included at both crossings. Sanitary Sewer will be impacted at South Thompkins where two 10x7' sections of box culvert will be required to install a 12" ductile iron pipe and 20" steel casing. An additional 12 inch sanitary pipe will be rerouted at South Thompkins. Water lines will be rerouted at each crossing with inserta valves in manholes. The project will include the demolition and replacement of sidewalks and 3 rail wooden fences. Riprap will be provided for channel stabilization. The project will be performed in two phases with North Thompkins being phase 1 and South Thompkins being phase 2. Phase 1 (N. Thompkins) must be substantially complete and opened to traffic before closing traffic for phase 2. Traffic Control must be coordinated with Savannah State

Award

Bridges / Tunnels

$1,242,880.00

Public - County

Site Work

19

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
23
Bidding Soon
485
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2021

May 13, 2021

img_map_placeholder

S Tompkins Rd, Savannah, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.